Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Cable Lugs, Cable Grips, Grounding Kits, Feeder Clamp, Struct Straps, Strut Caps
Establishment:
2010
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

3/8" Hole Stand off, Stand off Kit, Tower Stand off Adapter manufacturer / supplier in China, offering 3/8" Tapped Hole Stainless Steel 304 Tower Stand-off Kit, Tinned Copper Heavy Duty C-Type Compress Taps, 1/4" Easy Installed One Hole One Way Cable Clamp and so on.

1
    YRS
General Supplier
Supplier Homepage Electrical & Electronics Optical Fiber, Cable & Wire Cable Tools China Easy Fast Installation Double Eye Heavy Duty Pulling Grip

China Easy Fast Installation Double Eye Heavy Duty Pulling Grip

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $15.00/ Piece
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Type: Wire Mesh Grip
Certification: RoHS, ISO, SGS
Customized: Customized

Product Description
Heavy Duty Pullling Grip--double eyePulling Grips have either single or double eye for attaching to the pulling rope.The correct pulling grips eases low and high voltage cable pulling into ducts, trenches and conduits.Provide an efficient method for cable installation and support within their load carrying capacity.
Part NumberCable DiameterEye DiameterMesh LengthApprox Break StrengthDCS06130.25-0.52"(6.3-13.2mm)5"(127.9mm)30"(762.0mm)3500 lbs.DCS13190.53-0.74"(13.4-18.8mm)5"(127.9mm)45"(1143.0mm)5600 lbs.DCS19250.75-0.99"(19.0-25.1mm)5"(127.9mm)43"(1092.2mm)6800 lbs.DCS25381.00-1.49"(25.4-37.8mm)6"(152.4mm)59"(1498.6mm)9600 lbs.DCS38501.50-1.99"(38.1-50.5mm)7"(177.8mm)72"(1828.8mm)16400 lbs.DCS50632.00-2.49"(50.8-63.2mm)7"(177.8mm)72"(1828.8mm)16400 lbs.DCS63892.50-3.49"(63.5-88.6mm)9"(228.6mm)74"(1879.6mm)27200 lbs.DCS891154.00-4.50"(101.6-114.3mm)10"(254.0mm)76"(1930.4mm)33000 lbs.
Product Test
Company Information
Certificate
Packaging & Shipping

Trade termsFOB, EXW, CIF, DDU, DDPPayment termsT/T, L/C, NegotiableMOQ1Supply capability100000 pieces per monthLead timeusually 10 working daysShipmentExpress, air, seaPortShanghai, Ningbo, ShenzhenSample availabilityYesSample timeusually 3-5 daysPackaging
Normal: Plastic bag & Carton & Pallet
Special: Customized packing