Business Type:
Manufacturer/Factory
Business Range:
Wheel Loader, Mini Wheel Loader, Telescopic Loader, Mini Excavator, Construction ..
Establishment:
2012
R&D Capacity:
ODM, OEM
Terms of Payment:
LC, T/T, D/P, PayPal, WesternUnion
Main Markets:
North America, Europe, Australia
OEM/ODM Service
Sample Available

Wheel Loader, Mini Wheel Loader, Hoflader manufacturer / supplier in China, offering Everun Brand 1.2 Ton Agricultural Mini Wheel Loader with Euro3 Engine, Everun 2019 New Multifunctional Articulated Mini Wheel Loader with Euro3 Engine, 1.2 Ton Farm Tool Small Wheel Loader with New-Designed Attachments/Spare Parts for Sale and so on.

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery Lifting Equipment Forklift China Everun Forklift Truck 3ton Erdf30 Hydraulic Diesel Forklift Lifting Machine

China Everun Forklift Truck 3ton Erdf30 Hydraulic Diesel Forklift Lifting Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Units US $7800.00/ Units
Local Area: Qingdao, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, PayPal, WesternUnion
Brand: Everun
Cab Location: Not Adjustable
Type: Diesel Forklift
Power: Diesel Engine

Everun Hot Sale Forklift Truck 3Ton ERDF30 Hydraulic Diesel Forklift Lifting Machine
Product Description
Standard Equipment:
1. XINCHAI C490 ENGINE(Euro 3 emission)
2. HYDRAULIC TRANSMISSION;
3. 2-stage 3000MM mast;
4. 1220MM fork;
5. PNEUMATIC tire;
6. WARNING AND REAR LIGHT.

Specification
General
1
Model
ERDF30
2
Power type:
Diesel
3
Capacity:
3000kg
4
Load center:
500mm
Characteristics & Dimensions
1
Lift height
3000mm
2
Free lift height
120mm
3
Forks size(L*W*T)
1070*125*45mm
4
Mast tilt range F/R
6/10°
5
Fork overhang
(wheel center to fork face)
481mm
6
Rear overhang
500mm
7
Length to face of fork
2710mm
8
Overall width
1230mm
9
Mast lowered height
2070mm
10
Mast extended height
4210mm
11
Overhead guard height
2190mm
12
Turning radius
2500mm
Performance
1
Travel (no load) speed
20 km/h
2
Lifting (full load) speed
400mm/sec
3
Lowering (full load) speed
400mm/sec
4
Max. Drawbar Pall
(full load)
20000N
5
Max. Gradeability
(full load)
20%
Chassis
1
Front tyres
28*9-15-14PR
2
Rear tyres
6.50-10-10PR
3
Front tread
1010mm
4
Rear tread
980mm
5
Wheelbase
1750mm
6
Wheelbase center ground clearance
170/150mm
7
Lowest ground clearance
150/120mm
Weight
1
Self weight
4120kg
2
Front weight distribution (full load)
6420kg
3
Rear weight distribution (full load)
700kg
4
Front weight distribution (no load)
1720kg
5
Rear weight distribution (full load)
2400kg
Power & Transmission
1
Battery voltage/capacity
12V/80Ah
2
Engine model
China C490BPG
3
Engine Rated output/r.p.m
36.8/2650kw
4
Engine Rated torque/r.p.m
156/1700-1900
5
Engine No.of cylinder
4
6
Engine bore & stroke
90*105mm
7
Engine displacement
2670cc
8
Emission standard
China II
9
Engine fuel tank capacity
60L
10
Transmission Type
Mechanical
10
Transmissions stages (FWD/RVS)
2/2
12
Operating pressure
17.5mpa
Packing & Delivery
Packing: 3~4 unit in one 20GP container, 7~8 units in one 40"HQ container
Delivery Time: 10-15 days after deposit
Payment Term: T/T 30% in advance and the rest against BL and the loading photos
Delivery Port: Qingdao port

To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.
Company Profile
Qingdao Everun Machinery Co.,Ltd was established in 2007, has more than 10 years exporting experiences of wheel loaders and farming machinery. We have very much learned about the strengths and weaknesses of these machines. In 2011, we started to produce these machines ourselves under the help of our European customer. Most of our products are designed on the basis of European customers suggestion. Now Everun has two factories, one is in Qingzhou city, the other is in Jimo city. Everun products can be found working in more than 50 countries.


Our Service
Excellent after-service can earn more market; this will always be first principle in Everun's culture. In order to make a good
service for our European customers, we registered Everun Europe company in Germany which can supply spare parts, technical training for all European customers. Choose Everun, excellent service will be guaranteed.
We have enough spare parts stock in our stock and have professional engineer team, if you need any parts, we will send you with 2-3 days, and you will receive it with 7 days.
Pre-sales Service
- Professional sales team for inquiry and consulting support, we will try our best to give you a satisfactory and quick reply
- Professional technical team for designing and producing support, we will our best to meet customer's requirements.
- Professional oversea branch for testing support, customers can visit our dealers and see Everun machines.
- Visiting our factory and experience Everun machines in our workshops.
After-sales Service
- One year Warranty for Everun machines, in thi stime, if there is any parts broken by quality problem, we will arrange to send you new parts by DHL for free.
- Enough parts stock in factory and cooperate with direct DHL, we can guarantee customers can received the spare parts within 5working hours.
- In order to make a better service for European and Australian customers, we set up Everun Europe in Germang in 2014 and Everun WA in Australia in 2018 for technical tranning center, pats warehouse and other supports.


Certifications
Products research and development is always one of the most important factors in Everun's success, now we are specializing in producing and exporting of wheel loaders, tractors, tillers etc. Everun has adopted ISO 9001: 2000, the international quality management system, and most of our products has also passed CE,SGS,TUV certificate, and we have Rops & Fops cabin patent certificate.

Exhibition
Everun shows products in many different exhibitions in all of the world, Everun dealer will have a better understanding of Everun products.

FAQ
Q1. Are you manufacturer or trader?
A: We are manufacturer of wheel loaders, we have two factories, one in Qingzhou City, the other in Qingdao,. Wedesign and produce wheel loaders by ourselves.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% against copy of B/L.

Q3. How about your delivery time?
A: Generally, it will take 20-25 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q4. Are you interested in dealership with local company?
A: No, we just do export business with overseas company, we do not sell machine to local trading company.

Q5. What is your warranty policy?
A: We can supply one year warranty or 1200 working hours for our machines. We will provide parts as free within warranty.

Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ; 2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.