Gear Ring, Ring Gear, Excavator Parts manufacturer / supplier in China, offering Gear Ring for Excavator, Bulldozer, ZX240-3 Excavator Final Drive for Hitachi, ZX240-3 High evaluation planetary gearbox drives and so on.
Min. Order / Reference FOB Price | |
---|---|
1 Piece | US $1300.00/ Piece |
Local Area: | Jiangmen, Guangdong, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, PayPal |
Type: | Travel Reduction Gearbox |
---|---|
Application: | Excavator |
Certification: | SGS |
Part nameTravel gearbox (without motor)EquipmentEC210 EC210B excavatorPart number-Serial number#10001-14677,#30001-30780Stock code9298001frame holes30Sprocket holes22CategoryConstruction machinery parts,excavator spare parts,excavator hydraulic partsInstallationTravel reduction gear box,track gearbox,power transmissionApplicationReplacementItem conditionNewLogoBNMinimum order quantity1 piece
1. Completely,assembly and ready to installed in your EC210 EC210B excavators.2. Without motor,already been installed the motor shaft and motor housing.3. All components are produced by us.4. All new,undamaged.5. Painted or unpainted,depend on requirements.6. 90 days warranty,call or E-mail with any questions.7. Plywood case packing,free of fumigation.8. Deliver to worldwide by sea,air or carrier.
We are the manufacturer and own 18000 m2 factory areas, good relationship with material suppliers, which make more competitive price and steady quality.We have more than 80 units advanced facilities for production.We have 8 senior engineers with more than 30 years experience on designing and machining.Our sales term offer the efficient service for every customers.We are the long term parts supplier for many famous companies, such as FOSTER WHEELER POWER MACHINERY CO.,LTD and C.R.Dinly etc.We develop spare parts for old and new excavator models, and submit our latest products to customers every month so that to meet the market demand.We have high market share in Oversea market and Domestic market, Southeast Asia 60%, Russia 10%, Middle East 8%, North and South America 10%,Europe 8%, others 4%.
EXW, FOB, CFR, CIF
T/T, Western Union, Alipay, Paypal
Jiangmen Port, negotiation
Stock in hand: 4-7 days for processing and packingBulk Production: 10-35 days, depend on the quantity.By Sea, Air, Carrier
Customers offer the part number, part name, model, quantity, data of items, delivery term.We quote the best price according to the requirement of customers.Confirm the purchase order and pay the deposit.We prepare and pack the goods.Customers make the payment according to the Proforma Invoice once the goods get ready for delivery.We delivery the goods with the packing list, commercial invoice, B/L and other documents requested.Track the transport and arrival about the goods. Welcome to give us suggestion and feedback once arrival.