Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Gas Stove, Gas Stove with Oven, Gas Oven manufacturer / supplier in China, offering 4 Gas Burners Free Standing Gas Stove with Oven, Sb-CMC0518 Automatic Nespresso Capsule Coffee Machine, Mini Automaticcapsule Machine Nespresso Compatible Machine and so on.

1
    YRS
General Supplier
Supplier Homepage Consumer Electronics Kitchen Electronics Coffee Maker China Fashion Design Stainless Steel Espresso Coffee Machine

China Fashion Design Stainless Steel Espresso Coffee Machine

Get Latest Price
Min. Order / Reference FOB Price
1 *20′ US $24.00/ *20′
Local Area: Shenzhen, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Type: Espresso Coffee Maker
Capacity: 4cup(240ml)
Housing Material: Stainless Steel
Fashion Design Stainless Steel Decoration Espresso Coffee Machine
Model No.: SB-CM6912
Features:
'-4 cup espresso (240ml)
'-3.5bar working pressure for rich taste coffee
'- With frothing function for making cappuccino
'- Stainless steel decoration
'-Removable & washable drip tray for easy cleaning
'-Carafe with water leve gauge
'- Single knob for function transform and on/off, easy control with indicator light
'- With 4 cups stainless steel filter, aluminum alloy filter holder
'-230V/50Hz, 800W
'Unit dimension: W169XL329XH326
Certification:
CE/GS/EMC/RoHS

SpecificationPacking 120V/60Hz/800W
4 cup espresso (240ml)
3.5bar working pressure for rich taste coffee
With frothing function for making cappuccino
Stainless steel decoration
Removable & washable drip tray for easy cleaning
Carafe with water leve gauge
Single knob for function transform and on/off, easy control with indicator light
With 4 cups stainless steel filter, aluminum alloy filter holder
Unit dimension:320*200*332mm
GS/CE/EMC/RoHS/ETL approvalgift box size:238*215*350mm
4pcs/CTN
carton size:495*440*365mm
G.W./N.W.:11.5kg/9kg
20" Container Qty:1400pcs
40" Container Qty:2908pcs
40HQ Qty:3300pcs
MOQ:20"GP


Delivery:
Lead time: 45~50 days after receipt of the 30% TT deposit, and full packages
Port of loading: Shunde
Payment term: TT 30% deposit, the balance before shippment.
Remark:
MOQ: 1*20'Container