Business Type:
Manufacturer/Factory
Business Range:
Roof Roll Forming Machine, Color Steel Roll Forming Machine, Glazed Tile Roll Forming
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Track Roll Forming Machine, Stud Roll Forming Machine, Track Making Machine manufacturer / supplier in China, offering Highspeed Automatic Stud and Track Roll Forming Machine for Ceiling with Best Price, Changeable Metal Steel C Purlin Making Roll Forming Machine Made in China, Rfm Changeable Metal Steel C Purlin Making Roll Forming Machine and so on.

1
    YRS
General Supplier

China Galvanized Steel Metal Floor Deck Sheet Making Machine

Get Latest Price
Min. Order / Reference FOB Price
1 set US $31000.00/ set
Local Area: Cangzhou, Hebei, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Tile Type: Colored Steel
Certification: CE, ISO
Condition: New
Galvanized steel metal floor deck sheet making machine
Usage:
Detailed description:

No.

Item

1.

Processing Material

PPGI,GI

2.

Feeding Width

As drawing

3.

Processing Thickness(mm)

0.6-1.2mm or as your Customized

4.

Material of Rollers

Cr15

5.

Diameter of Shaft

90mm or as your Customized

6.

Forming Speed

10-15m/min or as your Customized

7.

Roller Driven

1.5 inch double Chain

8.

Cutting Model

Hydraulic Cutting

9.

Length Measurement

Encoder

10.

Control Style

PLC

11.

Operation Model

Touch screen

12.

Total Power

15+5.5KW

13.

Voltage

380V 50HZ 3Phase or As request

14.

Dimension(mm)

about 12500*1500*1550MM

15.

Weight

about 12.5T

16.

Stations

25 Stations

17.

Installation Dimension

about 18m*2m

18.

Workers

2

Introduction:
We have two kinds of floor decking roll forming machine ,one adopts memorial arch structure and guide pillar cutting system.Independent roller station makes the machine more beautiful and stability.The other uses middle plate structure and chain transmission.
Different views show:
Decoiling feeding and embossing
frame and forming rollersControl box and cutting device
Final sheet
Note for use and maintenance
1),before use,you must check whether all connections are steady,whether bolts and nuts are
tightinstallation.when start the machine,you must make sure there are enough lubrication oil in
the case.
2),when start the machine commissioning,the machine should run idle,then check it carefully
such as noise,vibration and whether the oil window works smoothly,whether every parts movement
coordination.
3),You must cut off power when install the mould,move the motor belt and big gear by hand,turn
the workbench and make sure the slide up to the highest point.
My company:
Delivery:
Terms of trade:
1. Minimum order quantity (MOQ): 1 piece
2. Delivery time: about 40 workdays
3. Port of loading: port of Tianjin
4. Type of payment: by T/T or by L/C
5. Export: Australia, UK, Ireland, Mexico, Brazil ,Israel ,Dubai, Russia ,India, Taiwan, Singapore,
Malaysia ,Thailand, Philippines, Myanmar ,Vietnam, South Africa, Mozambique,
Zambia, Zimbabwe, Nigeria, Egypt, Sudan, etc.