Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Insulating Glass Machine, Glass Processing Machine, Double Glazing Machine manufacturer / supplier in China, offering Auto Sealing Robot for Insulating Glass Machine Production Line, Insulating Glass Machine-2800 Vertical Automatic Insulating Glass Production Line, Insulating Glass Machine for Secondary Silicone Sealant Sealing Auto Sealing Robot and so on.

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery China Gas Filling Machine for Insulating Glass Production

China Gas Filling Machine for Insulating Glass Production

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $1500.00/ Piece
Local Area: Jinan, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Type: Insulating Glass Production Line
Certification: CE
Structure: Vertical
Argon Gas filling machine for insulating glass production, with 95% argon gas filling percentage.
FeatureUsed for IGU Argon gas fillingimported microcomputer controllerEngland oxygen sensor guarantee the gas filling percent4 sets input/output gas filling pipes at the same timeHighly automatic and stable performanceUniversal wheels for easy movement
Parameter
Power supply220V 50HZ 0.1KWNo. of gas filling pipe4 SetsDimension620x439x700mmWeight80Kg

Mostly asked questions below:
1. What is your soonest lead time?
A: 60 days for whole production line, 30 days for single machine. Special requirement pls check with sales.
2. How do you arrange the shipment?
A: all machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.
3. Guarantee ?
A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.
4. How we can install the machines?
A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.
5. How about the after service?
A: Spare parts within 72 hours.
Experienced technical sales sort out most of your questions.
Tens of service engineers ready for on-site service and instruction.