Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Hydraulic Diamond Core Drilling Rig, Core Drill Rig, Underground Core Drill Rig manufacturer / supplier in China, offering Gp90-3 All Hydraulic Diamond Core Drilling Rig, Sjz Series Vertical Shaft Drill, Mucking Loader for Mining Use and so on.

1
    YRS
General Supplier

China Gpl-3 Underground Diesel Load Haul Dumper

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $200000.00/ Set
Local Area: Qingdao, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Walking Mode: Wheeled
Load and Unload Method: Front Discharge
Certification: CE, ISO9001: 2000

Technical Data GPL-3 Underground Diesel LHD
I. Main Configuration
1. Diesel Engine:
Manufacture: German DUTEZ Company
Model: BF6M1013EC
Rated Power: 161KW/2300RMP
Cooling System: Water Cooling
Waste Gas Cleaning System: Water Filter or Purifier
2. Hydraulic Torque Converter:
Manufacture: America DANA Company
Model: C273
Type: Single Grade of Two-Element, with hydraulic drive pump
3. Power Shift Transmission:
Manufacture: America DANA Company
Model: R32336
Type: Power Shift
Gears: 3
4. Drive Axle
Manufacture: America DANA Company
Model: 16D2149
Type: The front axle is fixed, the rear axle is swung ±8°
5. Hydraulic System
Components: Working system, steering system, braking system, fill oil
system, cable system
The work steering pump, steering pump, multi-directional
control valve, conversion valve, charging valve and foot valve
are all imported famous brand.
6. Tire
Model: 17.5 x 25-20TT L-5S
Pressure: Front : 680 KPA Rear: 580 KPA
7. Others:
Hydro-cylinder: Self-made, the grease oil adopts imported combined seal
Blade: Adopt special 32 CrMoB2 alloys steel
II. Machine Parts Pictures:

III. Main Technical Datar:
1. Weight:
Dimension (transport): 8665mmx2174mmx2300mm
Bucket Capacity (SEA Stowage):3 m³
Rated Loading Capacity: 6000KGS
Max. Lifting Height : 4220mm
Max. Discharging Height 1515mm
Min. Discharging Height: 3150mm
Discharging Angle: 40°
Wheel base: 4270mm
Leaving Angle: 14°
Rear Axle Swing Angle: ±7°
Min. Off-ground Clearance: 285mm
2. Model & Bridge Load
Weight: 19200KGS
Rated Loading Weight: 7000KGS
3. Operation Capacity
Operation Speed: First Gear:: 0~4.7km/h

Second Gear: 0~9.4km/h
Third Gear: 0~18.4km/h
Climbing Ability: ≥20°
Max. Climbing Ability: 15°
Max. Attraction Force: 128KN
Max. Shovel Force: 117KN
Time of Tip-over Bucket: 8 S
Lifting Time of Swing Arm: 10 S
4. Steering
Max. Steering Angle: ± 38 °
Min. Steering Radius: Inter: 3580mm Outer:6310mm
III. Outline Dimensions Drawings:

IV. Main Spare Parts Technical Flow:
1. The plug welding working process of the front and rear rack, large arm, bucket etc as below:
1.1 The front and rear rack is the key part in the whole machine, so the quality is directly
related to the whole machine. The deformation of the rack will directly cause the other
parts of damage, even cause the whole machine scrap. Considering the machine quality
and working life, so the whole machine adopts the 460C alloy steel.
The technical flow:
Baiting- Bending Plaits- Connection and Alignment-Welding-Tempering (The tempering
temperature is 550~650 centigrade,elimination of the jointing stress and deformation )- Sand
Blasting- Bore a hole-Polishing and assemble with primer spray
1.2 The car adopts 460C alloy steel, the technical flow as above.
2. The Oil Cylinder Main Spare Parts Technical Flow:
2.1 The cylinder Barrel: welding oil mouth-honing, to ensure out-of-roundness of the cylinder
barrel
2.2 Piston Rod: Forging-Rough Turning-Hardening and Tempering-Finish Turning-Bore a
hole-Grinding-Hard Chrome Plating-Polished Finish
2.3 Pressure Test: The assemble oil cylinder through testing pressure and testing leak of
test-bed, after confirming everything is well then to be used. The testing pressure is 20Mpa
2.4 The oil cylinder seal adopts the combination seal.
3. The Main Shaft Parts Technical Flow:
Baiting-Rough Turning-Tempering-Finish Turing-Quenching-Grinding
The Material of front axle of big arm, rear axle of big arm, articulated in middle axle,lift, tipping
bucket and pin roll etc: 40Cr
4. All shaft sleeves are adopted lubricated oil copper bush.