Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Steel Square Bar, Square Steel Bar, S235jr Square Bars manufacturer / supplier in China, offering En 10025 S235jr S275jr Carbon Square Steel Bar, UL FM Approvals Flexible Coupling for Fire System, 4" 90 Degree Grooved Elbow Fittings and so on.

1
    YRS
General Supplier
Supplier Homepage Security & Protection Fire Control Fire Hose Fittings China Grooved Tee Grooved Reducing Tee Grooved Reducing Tee Fittings

China Grooved Tee Grooved Reducing Tee Grooved Reducing Tee Fittings

Get Latest Price
Min. Order / Reference FOB Price
100 Piece US $0.50/ Piece
Local Area: Guangzhou, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Certification: UL, CE
Surface Treatment: Red,Blue Painting,etc
Material: Iron Steel
Material: QT450-12, ASTM A536, GRADE 65-45-12 ,etc.Standard: ASME, ANSI, DIN, JIS, ASTM, UNI, BS ,etc.Pressure: 300PSI, 500PSI, 750PSI, 1000PSI.Surface treatment: red painted, orange painted, galvanized, red spraied, orange spraied, dacromet, epoxy powder, epoxy, electroplate, galvSpecialized Electrical Equipment anized+epoxy, etAccess Control System c.Applications: IndustriaElectronic Tube & Transistor l pipeline system on shipping ,mine, fire protection ,oil fieldPost-Press Equipment ,textile,powder plant,etc.Advantages:
1. Low price,high quality & fast deliverRecycling Machine y & strict inspection .
2. The fastest delivery
3. The lowest price
4. Most comprehensive standards and materials for your choice. 5.100% export.
6. Our products EXPORT to Africa, Oceania, midle east, eastern Asia, Western Europe etc.

Size

1/2"-12",DN15-DN500

Material

Ductile iron

Finish

Paint, Epoxy or Galvanization,Decomet

Approval

FM/UL

Usage

1) Automatic sprinkler system for fire protection on commercial, civil and municipal constructions like water supplying, gas supplying, heat supplying, etc.

2) Industrial pipeline system on shipping, mine, oil field, textile, powder plant, etc.

3) Pipeline system on subway station, railway station, airport, seaport, bridge, etc.

Payment

L/C or T/T

Delivery Time

within 30 days or as per customers requirement.