Product Description:
FAQ
Here are the most commonly asked questions:
Q1. Where is your factory?
A1. In Nanzhuang Foshan China.
Q2. What in your MOQ?
A2. MOQ: 1x20’gp, can mix color in one container.
Q3. What is the MOQ to use customer design carton?
A3. MOQ: 5x20'gp. if less than this qty will charge for carton design draft fee.
Q4. What is the MOQ for OEM?
A4. 5000 sqm / model
Q5. How you assure the quality?
A5. We inspect the quality during incoming material, production process, packing and loading.
Q6. What price you can offer?
A6. EXW, FOB, CFR/ CIF, ect
Q7. What payment you accept?
A7. Normally By TT, L/C also acceptable.
Construction method:
1:Prepare the required materials:
Adhesive caulking patch, caulking sponge, paving serrated knife, bucket or basin, balance ruler, rag
2:Construction steps:
1. Grouting agent mixing: medium-in-one two-in-one adhesive caulking agent to water, the ratio of water to
powder is 1:4, stir until no powder, the slurry is guaranteed to be used within 2 hours (Note: Do not soak the
water before the mosaic is laid )
2. Flatten the base surface: the paving base surface should be clean and flat, then use the paving serrated
knife to smooth the adhesive to the wall; the construction environment temperature is guaranteed between 5
and 39 degrees Celsius.
3. Preparation for paving: use a serrated knife to scrape the wavy stripes on the patch plane.
4. Paving: When laying the mosaic, use the balanced balance ruler to put a mosaic on the reference surface
to ensure the balance between each mosaic.
5. Plaster reinforcement: After the mosaic is laid, gently press the surface with a caulking sponge. Let the
surface level and mix evenly to ensure complete stability.
6. Preparation of caulk: stir the caulk.
7. Caulking: Fill the mosaic seam carefully with a sponge knife. The mosaic seam is not filled with dust and
it is inconvenient for future cleaning. (Note: a soft tool must be used. The final coagulation strength at the
seam is 28 days. During the period, try to avoid soiling).
8. Cleaning: Prepare a clean rag. After the filling is completed, the surface can be cleaned after 1 hour.
Daily cleaning can be done directly with a wet towel.