Business Type:
Manufacturer/Factory,Trading Company
Business Range:
UHMWPE Sheet, HDPE Sheet, Ground Protection Mats, Composite Road Mat, Crane Outrigger ..
Establishment:
2005
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Temporary Road Mats, Road Mats, HDPE Road Mat manufacturer / supplier in China, offering UV Resistant Durable HDPE Plastic Temporary Construction Ground Road Panel Indoor Floor Protection System Mat, Heavy Duty Pipeline Excavator Construction Road Rig HDPE Composite Mat, Maintenance-Free and Anti-Aging UHMWPE Panels for Marine Port Fenders and so on.

1
    YRS
General Supplier
Supplier Homepage Construction & Decoration Floors & Flooring Plastic Floor China Heavy Duty Civil Construction Rig Bog Mat for Oilfield

China Heavy Duty Civil Construction Rig Bog Mat for Oilfield

Get Latest Price
Min. Order / Reference FOB Price
100 Pieces US $105.90/ Pieces
Local Area: Dezhou, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Material: PE
Style: Chinese
Function: Anti-Slip, Moisture Proof, Rot Proof, Wear-Resistant, Fireproof, Waterproof, Soundproof, Anti-Static
Heavy Duty Civil Construction Rig Bog Mat for Oilfield

XINXING® Heavy Duty Civil Construction Rig Bog Mat for Oilfield, is the ideal heavy duty access solution for work sites and temporary access roads; engineered to provide a stable work platform, even in the most extreme environments.

5900x2130x88mm with hollow and overlap structure, provides a safe, cost-effective surface for year-round, all-weather performance. It is equal with TuffTrak mats, Mega Deck mats, Dura-base mats by a complete testing system, which could be checked the detailed test report and test video on YouTube.

Contact us to ask more questions.


Product Information

1. Heavy Duty Civil Construction Rig Bog Mat for Oilfield
Length: 5900mm (can be customized)

Width: 2130mm

Thickness: 88mm

Color: Black

Surface: anit-slip patterns

Unit Weight: Approx. 650kgs

Loading weight: 120Tonnes

Work Temporary: -50 - +50ºC

Our state-of-the-art manufacturing process could produce 100 PIECES per day, which will ensure the shipment very fast.

2. Heavy Duty Civil Construction Rig Bog Mat for Oilfield Advantages:

Solid ground support in all soils

Provide safe work platform for personnel

Reduce site construction cost

Reduce site reclamation cost

Reduce transportation cost

Reduce liner cost

Reduce liner disposal cost

Protect site from spills

3. Heavy Duty Civil Construction Rig Bog Mat for Oilfield Applications

· Temporary road and haul routes

· Stable jobsite platform and staging areas

· Ground protection in sensitive environments

· Liner protection and spill reduction for oil & gas drill sites


4. Test of Heavy Duty Civil Construction Rig Bog Mat for Oilfield
5. Guarantee of 6m x 2m x 28mm Temporary Composite Road Mat Ground Protection Plate
Hereby Xinxing gurantee that all the Xinxing GROUND MATS, Temporary road mat, construction truck mat, heavy duty access mat etc. can be used normally more than 5 years with no break, if there is any break caused by our material within 2 years, Xinxing will freely replace it.
6. Maintenance of 6m x 2m x 28mm Temporary Composite Road Mat Ground Protection Plate
I. Cleaning

No specialist equipment is required to clean the X ground mats, they can easily be cleaned using a pressure washer and cold water. If heavily soiled the excess mud should be brushed off before being pressure washed

II. Store

Temporary road mat, construction truck mat, heavy duty access mat etc. need to place in a flat ground or pallet

7. Case Study of 6m x 2m x 28mm Temporary Composite Road Mat Ground Protection Plate
Clients' Feedback
Our Company
The largest factory in China about Temporary Ground Protection Mat, Heavy Duty Temporary Black Plastic Road Mat, HDPE Access Mat, Construction Road Mat, Temporary Ground Mat, 8 workshops, 12 sets CNC machines, all kinds of certification and industry standards could be met. In addition, we could provide the best after-sale service, 24 hours online for you!

FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, balance before shippment.
Contact
Related Products

Temporary HDPE road matOil drilling rig floor mats hdpe compsite mat

HDPE plastic track mat HDPE oil drilling rig floor mats hdpe compsite mat

HDPE plastic track mat in high density polyethylene sheet

Molded HDPE road mats 4000x2000mm

HDPE chequer ground mat Anti-slip HDPE Road mat

Tough and durable HDPE lawn protection mats

extruded pe500 track matUHMWPE Portable Road Mat PE Temporary Roadways for Wetland

high performance Plastic Road cover mat ground protection mat

Ground Protection MatHDPE Road matstemporary roadways

weather proof temporary road mat and heavy duty roadways

heavy duty road matsground cover matsroad way panels

UHMWPE road construction mat temporary lane

plastic trackway panel made of hdpe

High density plasitc ground mat hdpe plastic tread plate

High density plasitc ground mat recycled plastic traction

pehd temporary lawn protection mats plastic road palte

pehd temporary lawn protection mats plastic crane road plate

heavy duty matting for larger access vehicles road mat temporary road mat construction road mat

HDPE Ground Protection Mat Large plastic track way panel Plastic Road cover mat