plastic tote boxes with hinged lids mould manufacturer
1. Yudo hot runner for mould
2. Good cooling system
3. Reliable qualtiy
4. On time delivery
JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- checking each part of mould's size after machining, according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's requirement again before mould shipping.
Product NameHeavy Duty Plastic Storage Tote Box Mold Product materialPPCore& Cavity Steel718Steel hardness:HRC34-38Mould StandardDMECavity Number1*1Injection SystemPoint gateEjector SystemStripper PlateCycle Time30~40STooling lead time60 daysMould life500, 000ShotsQuality assuranceISO9001
Our Advantage1. High quality2. Reasonable price3. On time delivery4. Good After-sale service5. Strict quality control6. All the mould are automotic.
Offer youIn-time response on letters, telephone calls or faxIn-time supply the quotation and mould designsIn-time communication on the technical pointsIn-time sending pictures for the mould machining progress and mould finishing scheduleIn-time mould test and sample deliveryIn-time mould delivery.
For more information please contact us.