Wire, Spring Wire, Mattress Wire manufacturer / supplier in China, offering Mattress Spring Wire, Factory Supply 2.5mm Low Carbon Steel Wire Hot Dipped Wire, Factory Supply Cold Drawn High Tensile Carbon Spring Steel Wire and so on.
Min. Order / Reference FOB Price | |
---|---|
20 Ton | US $1000.00/ Ton |
Local Area: | Zibo, Shandong, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | T/T |
Certification: | ISO |
---|---|
Surface: | Smooth |
Technique: | Drawn Wire |
Steel GradeQ195-Q235,Q235,SAE 1008-1018 Steel Wire RodDiameter5,5.5, 6.5, 7,8, 9,10, 12,14mm.etc.Coil weight1.8-2.1mtsApplicationdrawing, construction materials, machinery parts,construction for Houses, Bridges, Roads.Deliver Time7-20 working days after receipt of L/C or deposit by T/TPackingIn coils, loading in container or by bulk vesselPayment terms1).100% irrevocable L/C at sight.2).30% T/T prepaid and the balance against the copy of B/L.
3).30% T/T prepaid and the balance against L/C
Related ProductsOur Services
Pre-sale Service
Sample can be offered with sample charge and courier fee by buyer's side.
Pre-sale Service
We have a complete inventory, and can be delivered in a short time, many styles for you to choose from.
After-sale
Email you the tracking no, and help to chase the parcels until it arrive you.
Application
Company information
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of quot&quality first, customer first and credit-based" Since the establishment of the company and always do our best to satisfy potential needs of our customers.
Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with an irresistible force.
FAQ
Q1.What material do you have?
Q235B,Q345B,S235JR,S275JR,STK400/500
Q2.Can you provide sample for us?
Yes, free sample is available
Q4. How do you ensure quality control?
we ensure the quality control by 2 steps: 1)after finish, our workers will check it one by one. 2)our package department will check before they pack.