Highway Guardrail Post Hammer Diesel Hydraulic Road Fence Post Pile Driver
Product Description
Product Description
1.Pile driving speed,the average 3 minutes can realize piling 6 meters deep,namely a hole 3 minutes to play.
2.Oil province,is a common driver uses around half of a year can be a driver left money for you.
3.Bit using manganese steel manufacturing,through processing,are suitable for all kinds of geological environment.
4.Crawler walking,high walking and climbing ability The frame can be moved back and forth,bit can be adjusted,high piling position accuracy.
Technology Parameters
SpecificationsUnitYDBZ-23YDBZ-26YDBZ-361Hydraulic hammer model 2302603602Drill rod diametermm6875853Engine powerkwSingle Cylinder 23kwDouble cylinder 27kw4 cylinder 33kw4Hydraulic system pressurempa16-2016-2016-205The hydraulic system flow rateml/r40-5040-5063-806Nitrogen gas pressure rangeMpa1±0.11.7±0.11.7±0.17Hydraulic hammer impact frequencybpm500-900400-800400-8008Hydraulic hammer work flowl/min40-7050-9050-909Working pressure of hydraulic hammerMpa 9-11 11-14 12-1510Working stroke of hydraulic hammermm450-2800450-2800450-280011Piling efficiencymm/min21002400270012Net weightkgabout 2000about 2100about 220013Steel post diametermm90mm-500mm14Maximum ramming depthmm200015Maximum post lengthmm260016Drilling diametermm120,150,160,180,20017Drilling depthmm170018Maximum traction speedkm/h≤3019Traveling Speedkm/h8-1220Hydraulic tank volumeL8021Dimension(L*W*H)mm2800*2250*2300(folded)*3700