Business Type:
Trading Company
Business Range:
Hydraulic motor, Hydraulic pump, Gear pump, Gearbox, Hydraulic spare parts, Piston motor, ..
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
Terms of Payment:
LC, T/T, PayPal, WesternUnion
Main Markets:
North America, South America, Europe, Southeast Asia, Middle East, Africa, East Asia(Japan, South Korea), Australia, Domestic
OEM/ODM Service
Sample Available

Hydraulic Pump, Spare Parts, Oil Pump manufacturer / supplier in China, offering Hydraulic Pump A4vg56 Series Hydraulic Piston Pump for Excavator Paving Machinery Gear Pump Parts, 90r75 90m75 90r100 90m100 Hydraulic Piston Pump Motor Hydr Gear Pumps, PV23 Mf22 Mf23 Spv089 Hydraulic Piston Pump and Motor Swing Device Hydr Motors and so on.

1
    YRS
General Supplier
Supplier Homepage Industrial Equipment & Components Pump & Vacuum Equipment Plunger Pump China Hydraulic Pump A11vlo145 Gear Pump for Truck Crane Paver Line Pump

China Hydraulic Pump A11vlo145 Gear Pump for Truck Crane Paver Line Pump

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $352.00/ Piece
Local Area: Hangzhou, Zhejiang, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal, WesternUnion
Structure: Axial Plunger Pump
Cylinder Number: Single Cylinder
Drive Mode: Hydraulic Driven Reciprocating Pump
Our advantages:
1. There are lots of available A11VO series hydraulic piston pump in stock.
2. We are professional supplier of hydraulics.
3. Our factory has more than 10 years exprience in hydraulic industry.
4. Our factory is closed to Shanghai port & Ningbo port.
Product show:
Field application:
Package:
Delivery:

Payment term:

1. T/T: 30% deposit by T/T, 70% balance by T/T before shipment

2. L/C at sight

Trade term: EXW or FOB Ningbo/Shanghai

Delivery time:

We have huge quantity of inventory for complete pumps, motor and some spare parts,
so the leading time is within 3days if have in stock.
If haven't, within 5days if the quantity is less than 50pcs.
It depends on the quantity ordered.

Min. Order:
If the model is in common or the production are in our warehouse.
No MOQ for stocking production.Larger quantity, price will be more favorable.

Deliever Way:

By courier, like the DHL, UPS, Fedex,etc. It's door to door or barn to the door,
usually 5-7 days to arrive.

By air to air port, usually 3-5 days arrive.

By sea to sea port, usually 20-30 days arrive.

If your deliever time is very urgent, the best way is by courier or air.

If not, it's beat by sea.