Ultrasound Machine, Ultrasound Scanner, Color Ultrasound manufacturer / supplier in China, offering IN-A8 WiFi Wireless Android Handheld Pregnancy Color Ultrasound Machine Scanner, IN-I7E Medical Suction Machine Blackhead Leaf Oil Electric Water Suction Machine, IN-I7E Mini Portable Ambulance Manual Dust Electric Vacuum Suction Machine and so on.
Min. Order / Reference FOB Price | |
---|---|
1 Set | US $1150.00/ Set |
Local Area: | Guangzhou, Guangdong, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment |
Certification: | CE, ISO13485 |
---|---|
Trademark: | ICEN |
Origin: | China |
IN-GVT30 Medical Portable infrared illuminator detector locator vein finder
Specification for portable infrared vein viewer/finder/locator/detector
Light type
Near-infrared light
Image frame rate
20FPS
Infrared wavelengths
850 nm
LED lifetime
20000 hours
Package information
52X30x23cm, 2.3kg
Power Supply
DC 5V ≤3.5W
Image resolution
720*480
Weight
450g
Visible Vein Size
≥1mm
Dimension
240x60x60mm (LxWxH)
Accuracy
0.25mm
Battery working time
≈ 5 hours
Depth of Visible Vein
≤12mm
Battery volume
4400mAH
Best projection distance
200±20mm
Charging time
≈ 3 hours
Operating Mode
Handheld or Suspension
Battery detachable
Yes
IN-G0901 portable infrared vein viewer/finder/locator/detector handheld model vein illuminator includes main unit, battery (1pcs), charging base.
Fixed support or Mobile support is optional.
Color: 5 colors adjustable, for different patient skin tone and personal preference
Inverse: Allows clinicians to switch entre highlight the veins and highlight the surround tissue, for reduce the interference of skin tone, density of hair follicles and room brightness.
Brightness: 3 degree brightness adjustable, allow clinicians customizing the image brightness base on the environment light.
Resize: 3 kinds of image sizes, for pediatric patients or when need to focus on only one vessel. Enhanced Mode: Helpful for find the small or deep veins.
FAQ:
This depends on the quantity. Normally, for the mass production, we need about 7-10 days to finish the production.