Business Type:
Manufacturer/Factory
Business Range:
Gear, Gear Ring, Housing, Hub, Shaft, Carrier, Final Drive, Swing Reduction
Establishment:
2008
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Gear Ring, Ring Gear, Excavator Parts manufacturer / supplier in China, offering Gear Ring for Excavator, Bulldozer, ZX240-3 Excavator Final Drive for Hitachi, ZX240-3 High evaluation planetary gearbox drives and so on.

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery Engineering & Construction Machinery Engineering & Construction Machinery Parts China Innovative Final Drive Gearbox instead of GM series Apply for Crawler Excavator

China Innovative Final Drive Gearbox instead of GM series Apply for Crawler Excavator

Get Latest Price
Min. Order / Reference FOB Price
10 Piece Contact Supplier
Local Area: Jiangmen, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Type: Motor
Application: Excavator
Certification: SGS

Innovative Final Drive Gearbox instead of GM series Apply for Crawler Excavator


PART NAMEInnovative Final Drive Gearbox
EQUIPMENT
apply to Komatsu Excavator PC120-5 PC60-6 PC60-7 PC45, PC50-2, Sumitomo SH120 SH130, Caterpillar E70B E305.5, Kobelco Sk200-6E etc.
CATEGORY
Construction Machinery Parts, Excavator Spare Parts
INSTALLATION
POWER TRAIN
APPLICATION
Replacement
ITEM CONDITION
NEW
LOGO
BN
MOQ
1 pc
After marketing and researching for years, we found many Excavator Travel Reductions adopt the RV Transmission Mechanism, which is consisted of two Reduction Mechanisms: Involue Cylindrical Gears Reduction Mechanisms and RV Gears Reduction Mechanisms. Under high stress and high speed operating, the Needle Bearing of RV Gears Reduction Mechanism becomes the weakness which is easy to be damaged and cause the other components destroyed, the RV Transmission Mechanism must be broken down and shorten the life time of the Travel Reduction, the maintenance cost will be increased.
Therefore, we launch the Innovative Travel Reduction by accurate calculated and design based on years experience in producing Construction Machinery Parts. We adopt the Involute Cylindrical Mechanism which can reduce much stress of Needle Bearings and extend the service life. You just need to replace the planetary gears and bearings when they damaged, it's not only convenience for maintenance but also save the cost.
Till now, we had designed and launched Innovative Travel Reduction for several excavators which are adopting RV Transmission Mechanisms. They are approved and support by many customers because of the reliable quality and durable design.

DEscriptION:
1. Completely, assembly, and ready to installed in your Komatsu PC120-5 excavators.
2. Without MOTOR, already been installed the MOTOR SHAFT & MOTOR HOUSING.
3. All components are produced by us.
4. All new, undamaged.
5. Painted or Unpainted, depend on requirement
6. 90 days warranty, call or email with any questions.
7. Plywood Case Packing, free of fumigation
8. Deliver to worldwide by Sea, Air, or Carrier.
We are the manufacturer and own 18000 m2 factory areas, good relationship with material suppliers, which make more competitive price and steady quality.We have more than 80 units advanced facilities for production.We have 8 senior engineers with more than 30 years experience on designing and machining.Our sales term offer the efficient service for every customers.We are the long term parts supplier for many famous companies, such as FOSTER WHEELER POWER MACHINERY CO.,LTD and C.R.Dinly etc.We develop spare parts for old and new excavator models, and submit our latest products to customers every month so that to meet the market demand.We have high market share in Oversea market and Domestic market, Southeast Asia 60%, Russia 10%, Middle East 8%, North and South America 10%,Europe 8%, others 4%.


EXW, FOB, CFR, CIF
T/T, Western Union, Alipay, Paypal
Jiangmen Port, negotiationStock in hand: 4-7 days for processing and packingBulk Production: 10-35 days, depend on the quantity.
By Sea, Air, CarrierCustomers offer the part number, part name, model, quantity, data of items, delivery term.We quote the best price according to the requirement of customers.Confirm the purchase order and pay the deposit.We prepare and pack the goods.Customers make the payment according to the Proforma Invoice once the goods get ready for delivery.We delivery the goods with the packing list, commercial invoice, B/L and other documents requested.Track the transport and arrival about the goods. Welcome to give us suggestion and feedback once arrival.

1. Warranty Type: We will replace the product which have quality problem.
2. Warranty Period:
Supply 3 months warranty for the products from the date of arrival. Customer should check the items according to the order list after arrival. Contact with us and offer the data, photos of the problem items.
3. You need to pay for the replacement charge for following condition:
* Wrong Order from customer.
* Natural Disasters cause the damage.
* Error installation.
* The machine and reducer work over time and over load.
* Lost by any condition.
* Human element destroyed.
* Corrode with rust during stock and running.
* Warranty Expired.
4. Others
They are the product easy to be rust away, please wrap them well. We just supply warranty for the products we are producing, except the Bearing, Seal, and some others we mention before order.If there is any problem about the products, installation or maintenance, please contact with us any time. We reserve the rights of final interpretation.