Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Bridge Bearing, Pot Bearing, China Rubber Pot Bearing manufacturer / supplier in China, offering Sliding and Fixed Bridge Pot Bearing Supplier, Customized Bottom Door Galvanized Steel Strip for Roller Door, Wholesaler Hot Rolled Galvanized Steel Coil for Roller Shutter Door and so on.

1
    YRS
General Supplier
Supplier Homepage Construction & Decoration Geosynthetics Products Geogrid China Jubo Factory Direct Sale Landscape Recycled HDPE Grass Paver Grid

China Jubo Factory Direct Sale Landscape Recycled HDPE Grass Paver Grid

Get Latest Price
Min. Order / Reference FOB Price
300 Square Met US $7.20/ Square Met
Local Area: Nanchang, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Color: Black
Application: Retaining Wall, Steep Slop, Dam, Road Base
Viscose: Without Viscose
JuBo Factory direct sale landscape recycled hdpe grass paver grid

PRO LITE formerly known as ECO, same great product. New Name.

Designed for vehicular load and traffic, residential applications as well as pedestrian and bike applications, TRUEGRID PRO LITE is the toughest and most economical moderate-load permeable paver available. Made from 100% post-consumer recycled HDPE, TRUEGRID can be filled with gravel, seeded or sodded with grass or just laid to protect yard and prevent rutting and mud. TRUEGRID PRO LITE has compression strength equal to concrete, so you get natural, robust paving tough enough for cars and trucks. Better than concrete or blacktop, PRO LITE is 100% permeable so stormwater flows through the surface. Great for gravel or grass parking lots, access roads, driveways, fire lanes, RV and boat storage pads and many other paving applications. Protects grass used for parking and traffic. Stormwater drains through grid surface and is detained in the gravel or grass filled cells and subgrade. Help reduce flooding and runoff and keep water from your front door.

How to install TRUEGRID PRO LITE?

Laying Grid

Start in corner of project area with male tabs of first grid facing towards the center of the areaLine up female slots of next grid over male tabs of first grid.Press down with feet to lock grid into place.Repeat until area is covered with connected grid.

TRUEGRID's integral flex-joints may have some draw due to seasonally conditions which may cause some +/- gain or loss in overall dimensions.

Gravel Fill:

Fill grid with desired aggregate to top of grid.Lightly compact to settle.

Grass Fill:

Fill grid with soilSeed or sod.

FAQ
Q: Are you trading company or manufacturer ? A: We are factory.
Q:Is the quality of your products stable?
The company has acomplete QC system, and each batch of products will be sampled and the samples will be kept for 5 years.
Q:Can you do OEM?
A:Yes,
of course. We can produce the products as per your request.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could
offer the sample for free charge but do not pay the cost of freight.
Q: How long is your delivery time?
A: Generally it is 5-10
days if the goods are in stock. or it is 10-15 days if the goods are not in stock, it is according to quantity.
Q: What is your
terms of payment ?
A: Payment<=5000USD, 100% in advance. Payment>=5000USD, 30% T/T in advance,balance before shipment. If you have
another question, please feel free to contact us at any time.