Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Coating, Polyurea Coating, Polyurea Spraying Coating manufacturer / supplier in China, offering Antiabrasion, Anticorrossion, Antiwater Powerful Polyurea Coating for Any Projects, Any Kinds of Roller Shutters Made From China, Roller Shutters and so on.

1
    YRS
General Supplier
Supplier Homepage Chemicals Paint & Coating Building Coating China K11 Flexible Waterproof Coating for Construction

China K11 Flexible Waterproof Coating for Construction

Get Latest Price
Min. Order / Reference FOB Price
10 Box Contact Supplier
Local Area: Weifang, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Color: White/Grey
Appearance: Liquid and Powder
Main Raw Material: Acrylic
K11 Rubber Film Waterproof coating
is a kind of waterproof material which is modified by alkali-resistant synthetic cement substrate.
Technical data:

itemIIITensile strength Mpa ≥ 1.2 ≥ 1.8elongation≥200≥80impervious30min 0.3mpa30min0.3mpaLow temperature bendability-10 degrees-10 degrees Heat resistance 100 degreesHeat resistance 100 degrees


Product features:It can be applied on the wet base surface, and the waterproof layer has high mechanical strength and good wear resistance. 2. The coating can prevent moisture, salt pollution and inhibit the growth of bacteria. 3. The concrete can still maintain ventilation. based on this product, the waterproof layer can be directly tiled, mosaic and so on. 4 Consistently high hydrostatic pressure with a negative water surface. 5 This product has a white and gray appearance.Application process:
The base layer must be clean, solid, smooth, dry, ash-free, and sand-free
Pour the liquid material into the pre-prepared container according to the ratio, and then pour the powder into the liquid material in a ratio to stir well until the liquid, powder and.
Use a roller, a sprayer or a brush to evenly roll or spray the agitated slurry onto the cement base. The coating is 2-3 times, and the coating thickness is applied according to the design requirements.
The order of the coating is about 4 hours after the first application, the coating is dry and then painted in the direction of 90 degrees vertically, and so on.
After the construction is complete, it is forbidden to step on it within 24 hours. After it is completely dried, it can be used for other coverings (such as plastering, tiling, mosaic).