Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Roll Forming Machine, Roll Forming Machine Parts, Sandwich Panel Equipment, Purlin Forming
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Sandwich Panel Production Line, Roll Forming Machine, EPS Roll Forming Machine manufacturer / supplier in China, offering EPS/Rock Wool Roll Forming Machine EPS/Rock Wool Sandwich Panel Production Line, EPS Continuous Sandwich, Xn C Z Purlin Cold Roll Forming C Channel Making Machine, Automatic Quick Change Size Type C Purlin Sectional Shaped Roll Fomring Machine and so on.

1
    YRS
General Supplier

China Kexinda Storage Rack Roll Forming Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $35000.00/ Piece
Local Area: Beijing, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Tile Type: Colored Steel
Certification: CE, ISO
Condition: New

KEXINDA Storage rack roll forming machine for sale

Parameters of the storage rack roll forming machine

1. Technique parameters of the processing line

(1) Plate Material: Galvanized plate, steel, color steel

(2) Thickness of the plate : 0.8-2.8 mm

(3) Roller material hardness: 52HRC, hydraulic shear material: 62HRC

(4)Reducer :5.5kw

(5)Rollers: 20 steps

(6) Diameter of active shaft: 57mm

(7) PLC control systerm with inverter

(8) Dimensions of major structure:9.5m(length)*1.0m(width)*1.2m(height)

(9)Woking Speed: 8-12m/min

FAQ:
1:How to play order: Inquiry---confirm the profile drawings and price----confirm the PI---arrange the deposit or L/C---then OK

2:How to visit our company:

Fly to Beijing airport:By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.

Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.

3:When we exported the machines:

We have beening making and exporting the machines since from the year of 1998.
Our service:

1:Engineers available to service machinery overseas.

2: Warranty: 12 months.

3:Technical guidance for free forever.