Bakery Equipment, Bakery Oven, Electric Oven manufacturer / supplier in China, offering Kitchen Bakery Equipment Ce Approved Crown Series 3 Deck 6 Trays Commercial Electric Oven, 1 Deck 2 Tray Comercial Gas Pizza Oven, Kitchen Food Baking Machine Bakery Equipment Bread Toast Molding Machine and so on.
Min. Order / Reference FOB Price | |
---|---|
1 Piece | US $1350.00/ Piece |
Local Area: | Guangzhou, Guangdong, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, PayPal |
Usage: | Biscuit, Cake, Pizza, Bread, Baking Food |
---|---|
Power Source: | Electric |
Timing Device: | With Timing Device |
Hot Air Convection Oven types
ModelSpecificationDimension
(mm)PowerPower SourceTemperatureWGQ-3C3 Trays900*1375*5600.65kwGas300ºCWGQ-4C4 Trays900*1375*6700.65kwGas300ºCWGQ-5C5 Trays900*1375*7800.65kwGas300ºCWGQ-6C6 Trays900*1375*8900.65kwGas300ºCWGQ-8C8 Trays900*1375*12501.2kwGas300ºCWGQ-10C10 Trays900*1375*14701.2kwGas300ºCWGY-D-033 Trays720*1220*5405.1kwElectric300ºCWGD-3C3 Trays900*1290*5606.5kw,Electric300ºCWGD-4C4 Trays900*1290*6706.5kwElectric300ºCWGD-5C5 Trays900*1290*7806.5kwElectric300ºCWGD-6C6 Trays900*1290*8906.5kwElectric300ºCWGD-8C8 Trays900*1290*125013kwElectric300ºCWGD-10C10 Trays900*1290*147013kwElectric300ºC
Q1:Are you a trading company or factory?
A: Astar is a professional commercial kitchen equipment manufacturer with factory located in Baiyun District, Guangzhou, China. We have import and export rights & are able to provide one stop kitchen equipment purchase service for clients .
Q2:What product do you manufacture?
A:We mainly manufacture baking related kitchen equipment, including gas oven, electric oven, convection oven, rotary oven, pizza oven, proofer, sheeter, toast moulder, mixer and so on.
Q3:What is the payment term?
A:We accept T/T, W/U, L/C, DP and so on.
Q4: Do you arrange for shipment to buyer's country?
A:Yes ,we will arrange for shipment to any place ,but all ocean freight and custom declare fee belongs to buyers side. We accept Ex-works in factory ,FOB Guangzhou . CFR destined port . CIF destined port.
Q5: What is the delivery time?
A: For bulk quantity, leadtime will be about 5~15 days after receipt of deposit. For sample, usually we have products in stock, please feel free to contact us for detail.
Q6: What is your warranty?
A: 24/7 after sales hot line service & one year sparepart warranty.