Business Type:
Manufacturer/Factory
Business Range:
Temperature Humidity Chamber, Tharmal Shock Test Chamber, UV Test Machina, Vibation ..
Establishment:
2007
R&D Capacity:
OwnBrand, ODM, OEM
Terms of Payment:
T/T
Main Markets:
South America, Europe, Southeast Asia, Middle East
OEM/ODM Service
Sample Available

Temperature Humidity Test Instrument, High Low Temperature Testing Equipment, Humidity Test Machine manufacturer / supplier in China, offering Programmable Cycle Constant Temperature Humidity Environmental Test Equipment, Hydraulic Tensile Rubber Pllastic Tensile Strength Test Equipment, High Low Temperature Thermal Shock Impact Testing Equipment and so on.

1
    YRS
General Supplier
Supplier Homepage Instruments & Meters Test Instrument Test Machine China Lab Agree Test Equipment with Temperature Humidity Controller

China Lab Agree Test Equipment with Temperature Humidity Controller

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $120000.00/ Piece
Local Area: Dongguan, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: T/T
Type: Temperature, Humidity and Vibration Three Comprehe
Accuracy Grade: 1
Load Way: Electronic Load
Product Description
The temperature, humidity and vibration comprehensive application test system (three comprehensive test chambers) integrates temperature and humidity climatic stress tests with vibration tests such as vibration mechanics.
When the test system is working, the temperature changes (high temperature or low temperature) stress, humidity stress, vibration Stress and electrical stress are applied to the sample at the same time or separately, and the environmental simulation is more realistic and the test efficiency is higher than that of the single stress.
Now it has been widely used in the adaptability of aerospace, marine, automotive and other electronic products to the environment, using reliable assessment and assessment, applied to the early detection of electronic product design defects and screening of process defects.
Parameter

NameThree comprehensive vibration testing machineModelHJ-225HJ-800HJ-1000Size500*750*6001000-1000-8001000*1000*1000Technical indicatorstemperature range-20,-40,-70ºC Humidity range80,100,130ºCInternal material304Mirror stainless steel plateExternal materialSUMSU304 ror stainless steel plateOperation modeProgram temperature shock operation


Motion connection system
The movable interface connected to the vibrating table is reserved at the bottom of the test box, and there is enough space at the interface between the test box and the vibrating table to be displaced when the vibrating table is vertically vibrated, and a decompression port is reserved at the top of the test box. In order to buffer the vibration of the vibrating table, the pressure generated in the test chamber increases.
The interface between the test box and the vibrating table is made of high-low temperature resistant flexible silicone rubber sealing cloth, which has high strength, high flexibility, high sealing, high heat insulation, and long-term high and low temperature resistant sealing body. The layer is sealed and the sealing effect is good.
Cold heat exchanger
Brazed plate heat exchanger produced by the world's advanced Taiwan "Gao Li", which consists of several pieces of corrosion-resistant stainless steel sheets pressed by adult-shaped corrugations, and adjacent pairs of stainless steel sheets have opposite corrugations The corrugated backing lines intersect each other to form a large number of contact solder joints.
Due to the complex contact intersection network channel, the fluid on both sides forms a turbulent flow, which improves the heat exchange intensity, while the strong turbulence and the smooth stainless steel surface make the brazed plate heat exchange
The inner surface of the flow channel is not easy to scale. After using this heat exchanger, not only the system resistance is also reduced, but also the shortcomings of the large size, poor heat transfer and low efficiency of the domestic large-scale low temperature test box.
Delivery, installation, commissioning
1. Delivery time: After the contract is signed, the advance payment will be within one month. A set of information to the customer system, including product qualification certificate, factory acceptance report, technical schematic, instruction manual, circuit diagram, partial installation dimension drawing, software CD and so on.
2. Delivery method: The supplier is responsible for free transportation to the designated location of the buyer, and the buyer is responsible for lifting and equipment.
3. Installation and commissioning: The supplier is responsible for completing the location at the buyer's designated location.
Technical training
1. Describe in detail and demonstrate the functionality and operation of the system.
2. Use 2-3 users to conduct on-site technical explanations and operation instructions to the acquirer until the trainee is fully in control.
3. Training on routine maintenance and maintenance of system equipment, providing relevant precautions.