Climbing Formwork, Scaffolding Formwork, Similar Peri Formwork manufacturer / supplier in China, offering Construction Climbing Formwork for Bridge Construction Similar Doka, High Quality Hydraulic Lifting System for Construction, Hydraulic Safety Screen for High-Air Construction Men-Protection and so on.
Min. Order / Reference FOB Price | |
---|---|
300 Square Met | US $90.00/ Square Met |
Local Area: | Jian, Jiangxi, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, PayPal |
Material: | Steel |
---|---|
Type: | Climbing Formwork |
Application: | Slab Pouring |
Table formwork
Flexible and fast slab formwork
Table formwork is a kind of formwork that used for floor pouring , used widely in high-rise building , multi-level factory building , underground structure etc. During the construction, after the pouring completion, table formwork sets can be lifted by lifting fork to an upper level and reused, without need to dismantle. Compared with the traditional formwork, it is featured by its simple structure, easy disassembly, and being reusable. It has eliminated the traditional way of slab support system, which consists of cuplocks, eel pipes and timber planks. The construction speeds up obviously, and manpower has been saved greatly.
Standard unit of table formwork
Table formwork standard unit has two sizes: 2.44 x 4.88m and 3.3 x 5m .The structure diagram is as follows:
Assembly diagram of standard table formwork
For untypical floor casting, the non-standard table formwork can be designed according to the need. The combination of non-standard and standard table formwork can meet the needs of various shapes of floor pouring.
Edge and middle filler
Table formwork guardrail
The guardrail can be set at the edge of floor as needed, shown in the figure:
Lifting fork
The lifting fork for table formwork is used for lifting of the table formwork unit, which allows the overall transportation of the large-area table formwork, greatly improving the work efficiency and saving time. There are currently two main types of lifting fork s as shown:
Lifting fork operation chart
Project application
Shifting Trolley
The shifting trolley is used for the overall transportation of the formwork in the horizontal direction.
Trolley application diagram
Packing Details:Package Box, Steel Pallet, Steel frame, Container
Delivery Details:Generally it is 5-30 days, it is according to quantity.
Port:Shanghai
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
A: We are factory.
Q: How long is your delivery tim?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity
Q: Do you provide samples? is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.