Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Metal Decoiler, Automatic Decoiler, Coil Handling Equipment manufacturer / supplier in China, offering Sheet Metal Decoiler Machine for Coil Handling Equipment, Building Material Hot Dipped Galvanized Corrugated Sheet for Roofing, Ibr&Corrugated Roof Sheet Roll Forming Machine for South Africa and so on.

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery Building Material Making Machinery Purlin Machine China Light Steel Building Material Cold Roll Forming Machine Light Steel Framing Machine Light Gauge Steel Roll Forming Machine

China Light Steel Building Material Cold Roll Forming Machine Light Steel Framing Machine Light Gauge Steel Roll Forming Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $30000.00/ Set
Local Area: Cangzhou, Hebei, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Warranty: 1 Year
Certification: CE, RoHS, GS, ISO9001, SGS
Customized: Customized

Light Steel Building Material Cold Roll Forming Machine Light Steel Framing Machine Light Gauge Steel Roll Forming Machine
Light Steel Building Material Cold Roll Forming Machine Light Steel Framing Machine Light Gauge Steel Roll Forming Machine is used to plaster board, gypsum board and other decorative finishes lightweight board made of non-load-bearing walls and roof of the building style decoration, a variety of decorative building roof shape, inside and outside the building wall and ceiling scaffolding base material. Used in hotels, terminals, bus terminal, railway stations, theaters, shopping malls, factories, office buildings, old building renovation, interior decoration settings, roof and other places.

Specifications for Light Steel Building Material Cold Roll Forming Machine Light Steel Framing Machine Light Gauge Steel Roll Forming Machine
1.
Power
requirement
Type
380v/3ph/50hz
Main Motor power
5.5kw
Cutter power
5.5kw+2.3kw
2.
Forming speed(m/min)
0-30m/min max
Not include the time of cutting
3.
Forming stations
12 stations
5.
Material of rollers
CR12
6.
Thickness of structure
30mm
7
Forming shaft diameter(mm)
70
8
Drive
Gear box
9
Type of cutting
Hydraulic cutting
10.
Control system
PLC xinjie
11.
Install dimension(depend on the final design)
4.8mx0.6mx1.2m
Without panel length
12.
Total weight (Approx)
2.3T
Depend on final design
13.
Screen
Text screen /touch screen
Components
NO
Name
Unit
Qty
1
Man-made decoiler
set
1Max width 300mmInner diameter -460-510mmMax loading capacity 1000kgManual operating type manual expansion to tighten the coilBreak down drive whole line stop while decoiler idle
2
Feeding Table
set
1
3.
Forming Rollers
set
1Forming Station 16 nosForming Rollers material Cr12Forming Rollers hard treatment HRC 58-60Shaft of roller Diameter 40mmShaft material 40Cr,heat treatment, refine grindedMachine frame: steel weldingMain sidewall thickness 25mmMachine driven by universal joints via gearboxRoll forming motor 5.5kw with frequency inverter controllerGearbox RV worm gearbox
4.
Hydraulic cutting
set
1Hydraulic pump stand 1 setHydraulic Components taiwaneseHydraulic System discharging protection with wind coolerEdge cutting 2 sets both endsFire testing hole 2 sets both endsMould standard SKD-11 Steel JapaneseMould frame&plate S45CMould pin SKH-9 steel JapaneseAll mould treatment By slow-feeding Nc wire cutting
5.
Profile Discharger
set
1Driven machinical Auto HeadOperation Full automatic along with forming machine
6.
Electric Control system
set
1Frequency converter Silin ,TaiwanesePLC Fatek ,TaiwaneseTouch screen weinview TaiwaneseProfile length cutting forming machine stops then cutOperational controller: touch screen knob switch emg
Brake down and so on
(6)Power supplier 380V 50Hz 3phase
Photo for Light Steel Building Material Cold Roll Forming Machine Light Steel Framing Machine Light Gauge Steel Roll Forming Machine

about US:
More Products for Your Choose:
FAQ:
1. How long the machine could be made?- Normally speaking, light gauge steel frame machine could
be made within 45 working days. If you need machines in a hurry, we can make it for you
less than a month.
2. How to visit your company?
-a.Fly to Beijing airport:By high speed train From Beijing Nan to Cangzhou Xi (1 hour),
then we can pick up you.
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5
hours), then we can
pick up you.
3. Do you have after sales support?
-Yes, we are happy to give advice and we also have skilled technicians available across the
world.We need your machines running in order to keep your business running.