Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Insulating Glass Machine, Glass Processing Machine, Double Glazing Machine manufacturer / supplier in China, offering Auto Sealing Robot for Insulating Glass Machine Production Line, Insulating Glass Machine-2800 Vertical Automatic Insulating Glass Production Line, Insulating Glass Machine for Secondary Silicone Sealant Sealing Auto Sealing Robot and so on.

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery China Manual Argon Gas Filling Machine for Insulating Glass Offline Gas Filling

China Manual Argon Gas Filling Machine for Insulating Glass Offline Gas Filling

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $1850.00/ Piece
Local Area: Jinan, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Type: Insulating Glass Production Line
Certification: CE
Structure: Vertical
Argon Gas filling machine for insulating glass production, with 95% argon gas filling percentage.
FeatureUsed for IGU Argon gas fillingimported microcomputer controllerEngland oxygen sensor guarantee the gas filling percent4 sets input/output gas filling pipes at the same timeHighly automatic and stable performanceUniversal wheels for easy movement
Parameter
Power supply220V 50HZ 0.1KWNo. of gas filling pipe4 SetsDimension620x439x700mmWeight80Kg

Mostly asked questions below:
1. What is your soonest lead time?
A: 60 days for whole production line, 30 days for single machine. Special requirement pls check with sales.
2. How do you arrange the shipment?
A: all machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.
3. Guarantee ?
A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.
4. How we can install the machines?
A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.
5. How about the after service?
A: Spare parts within 72 hours.
Experienced technical sales sort out most of your questions.
Tens of service engineers ready for on-site service and instruction.