Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Metal Stamping Parts, Deep Drawn Parts, Assembly Parts
Establishment:
2002
R&D Capacity:
ODM, OEM
Terms of Payment:
LC, T/T, D/P, PayPal, WesternUnion
Main Markets:
North America, Europe
OEM/ODM Service
Sample Available

Stamping Parts, Auto Parts, Stamping manufacturer / supplier in China, offering Heavy Duty Galvanized Stamping Bracket Parts for Elevator Supporting Usage, Popular Product Metal Steel Elevator Bracket Stamping Parts with Zinc Plating, Customized Q235B Precision Metal Fabrication Stamping Parts of Automatic Machine and so on.

1
    YRS
General Supplier
Supplier Homepage Tools & Hardware Hardware Accessories Other Hardware Accessories China Metal Quadrant for Volume Control Damper-Stamping

China Metal Quadrant for Volume Control Damper-Stamping

Get Latest Price
Min. Order / Reference FOB Price
3000 Piece US $5.00/ Piece
Local Area: Zhejiang, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, PayPal, WesternUnion
Size: for Single-Blade Dampers
Certificate: SGS, ISO 9001
Application: Quadrant for Volume Control Damper
Material:valve body DX53D+Z275, regulator DX51D+Z275, rods Q235+zinc plating, washer stainless steel 301
Accessaries:body, regulator,long rod, washer, short rod, u-clamp, bush and screw.

Our manufacturing capability- Punch machines range from 16T to 500T
- Hydraulic plate shears
- CNC bending machine
- Hydraulic drawbench
- CNC laser cutting
- Robtic welder
- Automatic powder coating lineOur secondary operations in house· Riveting
· Tapping
· Welding
· Drilling
· Assembly
· Painting
· Powder CoatingOur in house QC equipment·2D projector tester
·Torque tester
·Tension machine
·Salt spray tester
·Zinc-coated tester
·Infrared ray tester
·Go and no go gauge
.Jigs.


Q: What is the payment method?
A: We accept TT (Bank Transfer), L/C.
1. For total amount under US$3000, 100% in advance.
2. For total amount above US$3000, 30% in advance, the rest against the copy document.
Q: What is your MOQ?
A: MOQ depends on our client's needs, besides,we welcome trial order before mass-production.

Q: What is the production cycle?
A: It varies a lot depending on product dimension,technical requirements and quantity. We always try to
meet customers' requirement by adjusting our workshop schedule. Usually our normal lead time is 25-30
days for 1 full container; it is also up to the actual production situation and products structure.
Q: If you make poor quality goods,will you refund our fund?
A: We make products according to drawings or samples strictly until them reach your 100% satisfaction.
And actually we won't take a chance to do poor quality products.We are proud of keeping the spirit of
good quality.
Q: Could you offer competitive tooling cost?
A: We have own mold work-shop in our factory, for competitive tooling cost and on-time
samples.
If you are interested in product,please click " SEND " for more details. ↓↓↓