Business Type:
Manufacturer/Factory
Business Range:
Rubber Vulcanizing Press Machine, Open Mill, Rubber Refining Machine, Batch-Off Cooling ..
Establishment:
2010
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Rubber Mixer, Mixer, Mixing Mill manufacturer / supplier in China, offering Rubber Open Mixing Mill with BV ISO SGS, Waste Tyre Stripe Cutter for Cutting Scrap Tires, Waste Tyre Splitting Cutting Machine for Scrap Tyre Recycling Plant and so on.

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery Rubber Machinery Rubber Product Making Machinery China Motorbike Motor Bicycle Rubber Tire Inner Tube Curing Press with ISO BV SGS

China Motorbike Motor Bicycle Rubber Tire Inner Tube Curing Press with ISO BV SGS

Get Latest Price
Min. Order / Reference FOB Price
2 Piece US $50000.00/ Piece
Local Area: Qingdao, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Brand: Maoyuanfeng
Certification: ISO
Condition: New
Customized: Customized
Product Profile:
This machine is uesed to produce tyre,hydraulic press for tyre, It can produce more size small tyre,weel barrow tyre,For example,:3.50-4,3.50-5, 4.00-8,650-8.
Our Machine Advantage:
Our machine is fully automatic control, compact, small footprint, simple workers, high productivity, low cost devices, easy maintenance, low maintenance cost
if need a lot of tires, this is a great business opportunity, if you are using this machine, you can earn huge profits, we have the product quality is very good, low price, we provide technical training, machine specific details, Can be customized according to customer requirement
Technical Parameter of Motorcycle Tire Vulcanizing Curing Press Machine

TypeYLL-600YLL-1000YLL-1400YLL-1600YLL-2000Total pressure(KN)600 1000140016002000 Working layer number22222Steam chamber internal dia.(MM)820830105011501450 Piston(MM)250285340360400 High Perssure(Mpa)131615.51614Low pressure(Mpa)55555Pressure in bladder(Mpa)1.52.12.12.12.1Steam-Working pressure(Mpa)0.6-0.80.6-0.8 0.6-0.80.6-0.80.6-0.8Overall dimension1200x900x24001200x900x23581360x1050x38201410x1060x35001500x1500x3200Weight (Kg)32004500600070008000


FQA-Problems of customer concern:
about machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3. Q: Which PLC?
A: Siemens, Omron, Mitsubishi
4. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
about installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
about after-sales service
1. Q: What is the warranty time?
A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.
Machine Assembly At Our Factory:
Machine Running at Customer's Factory:
Foreign Customers Visit Factory: