Product Profile:
This machine is uesed to produce tyre,hydraulic press for tyre, It can produce more size small tyre,weel barrow tyre,For example,:3.50-4,3.50-5, 4.00-8,650-8.
Our Machine Advantage:
Our machine is fully automatic control, compact, small footprint, simple workers, high productivity, low cost devices, easy maintenance, low maintenance cost
if need a lot of tires, this is a great business opportunity, if you are using this machine, you can earn huge profits, we have the product quality is very good, low price, we provide technical training, machine specific details, Can be customized according to customer requirement
Technology Parameter:
TypeMLB-650/40MLB-800/60MLB-800/100Largest mold closing force (T)25-406080-90Hot plate diameter (mm)500-650800800-840Hot plate clearance (mm)300-600500-600600-650Applicable rim diameter (inch)4"-5"-6"-8"8"-16"16"-18"Mold quantity (set)221Diameter of piston (mm)200200290Diameter of center pole (mm)25-3535-4040Stroke of center pole (mm)200200300Working press (Mpa)0.6-0.80.6-0.80.6-0.8Internal air pressure (Mpa)1.81.81.8Internal steam pressure (Mpa)0.8-1.50.8-1.50.8-1.5Preshaping inter pressure (Mpa)0.1-0.20.1-0.20.1-0.2Motor power (KW)7.57.511Machine outline(LxWxH) (mm)1200x900x23002400x900x29102400x900x2910Weight (kg)250028003500
FQA-Problems of customer concern:
about machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3. Q: Which PLC?
A: Siemens, Omron, Mitsubishi
4. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
about installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
about after-sales service
1. Q: What is the warranty time?
A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.