Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Machine Knob, Bakelite Handle Knob, Knob with Screw manufacturer / supplier in China, offering Machine Use Black Bakelite Handle Star Knob with Screw, Rubber Washer Grommets Protect Wires Rubber Ring Sealing Grommet, Custom Molded Nitrile Rubber Grommet Silicone Rubber Grommet and so on.

1
    YRS
General Supplier

China Mt PU Elastic Spiders for Shaft Coupling

Get Latest Price
Min. Order / Reference FOB Price
1000 Pieces US $2.00/ Pieces
Local Area: Hengshui, Hebei, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Standard Or Nonstandard: Customized
Shaft Hole: Customized
Torque: Customized
Product description

Material

Materials for silicon,fluorine,NBR,FPM,EPDM,SILCONE ACM,HNBR Inspection Equipments Excellent chemical and physical property, excellent oil- resistance, high temperature stability, etc. Tolerance +-0.05mm Drawing Format PDF/DWG/DXF/IGS/STEP,etc Application field Parts are used on vehicles, printing machines, food processing machines, textile machines, electronic machines, etc. Manufacturing process CNC machining Broaching, Drilling, Milling, Other Machining Services, Rapid Prototyping, Turning,Shape As per your drawing Or the sample Color servicecustomizationQC inspection

Make sure 100% inspection before the delivery

AdvantagesMaintenance,acturally HRC coupling doesn't need maintenanceEnvironmental, elastic components make HRC coupling applies to a variety of working conditions

Reliable transmission, in case of elastic component is damaged, the dog segment wichcasted siamesedly still keep the transmission processing reliably

Economic, HRC couplings have already been made of optimization design,which make transmission power match the transmission shaft diameter

Good recovery capacity, elastic components can reduce the load at the peak moments, and the deviation is a major consideration when designing.

Adaptability of misalignment, HRC can coupling contains parallel shift, angle shift and axis shift which
happen some times



Application and analysis

Our warehouse
Custom rubber parts
Custom plastic parts


Packing & Delivery
Packaging Details
plastic bag packing inside, carton packing outside, or customized packing.
Port
Xingang port, Tianjin city
Lead Time :

Quantity(Pieces)1 - 10001001 - 1000010001 - 50000>50000Est. Time(days)51218To be negotiated


Company Profile
Company Brief Introduction:
SHEN ZHOU AOKAI RUBBER & PLASTIC CO.,LTD was founded in 2000. The factory located in industrial zone of shenzhou city, hebei province, china.
We have Plastic injection molding workshop and rubber compression molding workshops.
Our main products includes Bakelit Knobs,Pull Handle,rubber door stops, door guard, roller, rubber bumpers, Rubber grommets, vibration dampers, seals, plastic corner, injection plastic brackets, injection plastic shell.
to undertake various kinds of rubber molding and plastic injection parts, customize according to drawing and samples.
The products have been exported to America, Europe, Oceania, Middle East, Southeast Asia and other regions and countries, and hope to build more business Cooperation with new client from all over the world.
FAQ
Q1: Are you a manufacturer or a trading company?
A1: We are the original manufacturer of custom rubber parts and custom plastic parts.
Q2: Where is your company located?
A2: Our company is located in Shenzhou City, Hebei Province, China.
Q3: Could I get free samples?
A3: We could provide small samples for free, but air freight or sea freight should be borne by customer side.
Q4: What should I provide in order to get an offer?
A4: Customers are required to provide material, inner diameter, outer diameter, cross section distance and quantity.
Q5: How is the goods packed by your factory?
A5: The goods are normally packed by plastic bags, carton boxes with pallets or wooden boxes.
Q6: What are the incoterms applied?
A6: The incoterms applied are FOB, CIF and CFR.
Q7: What are the payment terms accepted?
A7: We accept Alibaba Trade Assurance, T/T, L/C and West Union.
Q8: What about the delivery time?
A8: The goods are normally dellivered to customer side within 7-30 days based upon the mode of transport required.