Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Cable Lugs, Cable Grips, Grounding Kits, Feeder Clamp, Struct Straps, Strut Caps
Establishment:
2010
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

3/8" Hole Stand off, Stand off Kit, Tower Stand off Adapter manufacturer / supplier in China, offering 3/8" Tapped Hole Stainless Steel 304 Tower Stand-off Kit, Tinned Copper Heavy Duty C-Type Compress Taps, 1/4" Easy Installed One Hole One Way Cable Clamp and so on.

1
    YRS
General Supplier
Supplier Homepage Electrical & Electronics Optical Fiber, Cable & Wire Cable Tools China Non-Conductive Widely Used Stainless Steel Whipsocks

China Non-Conductive Widely Used Stainless Steel Whipsocks

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $15.00/ Piece
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Type: Wire Mesh Grip
Certification: RoHS, ISO, SGS
Customized: Customized

Product Description
WhipsocksWhipsocks are woven in Stainless steel wire mesh.Two mounting points and the long gripping area.Help prevent abrasion to the hose underneath.The eyes on these grips are reinforced with a thimble for extra durability.Used on any application where high-pressure hoses are used, air, water, hydraulic, slurry, etc.
Part NumberCable DiameterMesh LengthApprox Break StrengthWS08140.315-0.551"(8-14mm)15.75"(400mm)1780 lbs.WS14200.551-0.787"(14-20mm)21.65"(550mm)2000 lbs.WS20300.787-1.181"(20-30mm)25.20"(640mm)2890 lbs.WS30401.181-1.575"(30-40mm)34.25"(870mm)5330 lbs.WS40501.575-1.969"(40-50mm)38.19"(970mm)5330 lbs.WS50601.969-2.362"(50-60mm)49.21"(1250mm)12220 lbs.WS60702.362-2.756"(60-70mm)51.18"(1300mm)12220 lbs.WS70852.756-3.346"(70-85mm)53.15"(1350mm)12220 lbs.WS0033.346-3.937"(85-100mm)72.44"(1840mm)12220 lbs.WS3123.937-4.724"(100-120mm)72.05"(1830mm)20660 lbs.WS0044.724-5.512"(120-140mm)86.61"(2200mm)20660 lbs.WS0065.512-7.087"9(140-180mm)93.31"(2370mm)20660 lbs.
Product Test
Company Information
Certificate
Packaging & Shipping

Trade termsFOB, EXW, CIF, DDU, DDPPayment termsT/T, L/C, NegotiableMOQ1Supply capability100000 pieces per monthLead timeusually 10 working daysShipmentExpress, air, seaPortShanghai, Ningbo, ShenzhenSample availabilityYesSample timeusually 3-5 daysPackaging
Normal: Plastic bag & Carton & Pallet
Special: Customized packing