Business Type:
Manufacturer/Factory,Other
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
Terms of Payment:
LC, T/T
OEM/ODM Service
Sample Available

Noodle Machine, Noodle Production Line, Stick Noodle Machine manufacturer / supplier in China, offering Automatic Stick Noodle Production Line/Good Quality with Low Price/ It Is Export to Many Countries/Egg Noodle/Dried Noodle, Factory Price Instant Noodle Making Machine Equipment, Professional Factory Supply Stainless Steel Noodles Processing Automatic Machine and so on.

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery Machinery for Food, Beverage & Cereal Food, Beverage & Cereal Production Line China Noodle Machine Fully Automatic Fried Instant Noodle Production Line Noodle Machine Noodle Making Machine Noodle Making Line

China Noodle Machine Fully Automatic Fried Instant Noodle Production Line Noodle Machine Noodle Making Machine Noodle Making Line

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $350000.00/ Set
Local Area: Dongfang, Hainan, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Processing Material: Flour
Application: Noodle
Customized: Customized
Technical parameters of instant noodle production line
output: 160000PCS/8H
roller pairs: 8 pairs
steam consumption:≥0.8Mpa;
Total Power:around 110KW not including packaging machine,380V,50Hz ;
Environment and working conditions of instant noodle production line
Industrial electricity, power supply, water and steam are required in the workshop.

Thecomposition of fried instant noodle production line
The instant noodle production line is composed of brine mixer, brine measuring device, dual-axis mixer,aging machine,compound roller, multi-layer steamer, square noodle cutting and dividing machine, fryer, cooling machine, conveyor and other unit machines.
Service commitment
This series of products have the characteristics of new technology, reasonable technology, stable operation and convenient maintenance. And be responsible for installation, commissioning equipment and training operators.
Parameter
model numbercapacityPowerSteam consumptionWorkshop for single layer steamer dimension(m)Workshop for 3 layer steamer dimension(m)WorkersBFP-20040000/8H45KW1200-1300KG/H70*5*450*5*44BFP-30060000/8H56 KW1200-1400KG/H75*5*460*5*44BFP-400110000/8H83 KW1800-2000KG/H100*6*475*6*44BFP-500140000/8H90 KW1800-2100KG/H100*6*475*6*44BFP-600160000/8H106 KW2000-2200KG/H100*7*4.580*7*4.55BFP-700200000/8H114 KW2400-2600KG/H110*8*4.580*8*4.55BFP-800230000/8H125 KW2600-2800KG/H110*8*4.590*8*4.55 workers:( not including packaging workers )
Cooperative enterprise
FAQ:
1. Q: Are you manufacturers?
A: We are manufacturer of noodle machine with 40 years experiences, and more than 40 engineers, who can design the machine according to your special request.
2. Q: What is your noodle machine for?
A: Our noodle machine can produce many kinds of noodles, such as stick noodles, fresh noodles, instant noodles, fried instant noodles, non fried instant noodles, chowmein noodles, noodle leaves, extruding noodles, etc.
3. Q: How many countries have you exported to?
A: we have exported to more than 40 countries, such as Canada, Turkey, Malaysia, Nigeria, Bangladesh, Indonesia, India, etc.
4. Q: What is your delivery time?
A: 40-50days. For special request, we can deliver the machine within 30 days.
5. Q: What about aftersales service?
A: We have 30 after-sales service staff with overseas service experience, will to assemble the machine and train the customer's workers when machine arrives.
After sales service commitment
In order to provide better service for customers, to make customers feel more at easy after cooperation with our company.
Our company promise as follows:
1. Three guarantees should be implemented within one year from the date of completion and commissioning of the equipment.
During the warranty period, the company is responsible for repair and replacement of spare parts free of charge in case of failure due to internal quality problems of the equipment (excluding human factors).
2. After the equipment is delivered for use, the supplier should be provided with free technical guidance and training by electrical personnel and mechanical operators in the demander, including can learn after teaching and accommodation.
3. When the demander's equipment is in normal continuous production, the supplier shall send technicians to make a return visit by telephone or email once every six months, and assist the demander in equipment maintenance if there is any problem.
4. After the warranty period. The price of the equipment parts required by the demander (refer to the self-made parts of the supplier) can be reduced by 10% for timely supply.
5. The above services shall be provided until the demander stops using the equipment. During the use of the equipment, if the supplier has new technical projects launched, it can give priority to the technical transformation of the equipment for the demander, and only charge the cost.