Business Type:
Trading Company
Business Range:
Die Casting, Cast Iron, Stainless Steel Casting, Steel Forging
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
Terms of Payment:
LC, T/T
Main Markets:
North America, Europe, Australia
OEM/ODM Service
Sample Available

Rocker Arm, Engine Rocker Arm, Auto Rocker Arm manufacturer / supplier in China, offering OEM Auto and Motorcycle Spare Parts Engine Rocker Arm, Customized Stainless Steel Spigot Glass Clamp for Railing System, Investment Casting Stainless Steel Cylindrical Swimming Pool Glass Clamp and so on.

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery Casting & Forging Sand Casting China OEM Services Precision Cast Iron Heavy Duty Truck Trailer Parts

China OEM Services Precision Cast Iron Heavy Duty Truck Trailer Parts

Get Latest Price
Min. Order / Reference FOB Price
200 Pieces US $2.30/ Pieces
Local Area: Qingdao, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Type: Clay Dry Sand
Casting Method: Directional Crystallization
Sand Core Type: Resin Sand Core

OEM services precision cast iron heavy duty truck trailer parts


1.High quality control
2.Competitive price
3.Punctual delivery

At Seger industrial, we produce a huge range of products and are continually expanding our services to customers. This area shows images of some of our recent work to show the scope available to our clients. This is just a sample of what we can do, so please contact us for more information.


2.Strict Quality Control

We will design each speical checking tooling control key dimension during production to ensure each key dimension under control.
3.Packing:
a>Seger packing:carton box+wooden case/pallet/iron cage
b>As pre client's special requirement
4.Our Service:

*A "bespoke" service to make castings and forgings to customers specific requirements with drawings,samples

*Market-oriented, different grades of products geared to the needs of different customers

*Advance equipment,professional technology and serious inspection procedure to ensure good quality

*In-time delivery will always satisfy customers" needs

*Best after-sale service all the time for a long trade cooperation term
5.FAQ:

Q1:What's the lead time?

A1: In general,the lead time is about 30~40 days for opening new moulds and mass production.

Q2:What file formats does Seger accept for drawings:

A2:The company ca accept a range of formats for drawings,but the main ones are detailed below:2-D PDF AND TIFF3-D STL,IGES,STEP,Solidworks,etc

Q3:Is it possible to visit seger to view it's manufacturing process?

A3:We are extremely proud of our facility and existing customers to visit our company.we think you will be impressed by us,as well as the warm welcome from our friendly,experienced team.
6.Specification:

1

material

Cast iron, grey iron, ductile iron, steel, stainless steel, brass, copper, aluminum, zinc etc

2

process

sand casting, precision casting, investment casting, lost wax casting, die casting, forging, stamping, machining etc

3

machine

lathe, CNC, drilling machine, milling machine, boring machine, planting machine, machining center etc

4

tolerance

casting:0.5mm, machining:0.05mm, finish machining:0.005mm

5

capacity

max diameter:1M, max weight:200KG

6

surface treatment

powder coating, painting, spraying, galvanization

7

standard

JIS, ANSI, DIN, BS, GB