Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Arc Welding Machine, Seam Welder, Inverter Wedling Machine manufacturer / supplier in China, offering Tank Welding Machine & Tank Construction Machine (EGW/AGW), High Speed Band Saw Cutting Machine, Five Axis CNC Flame/Plasma Pipe Cutting and Profiling Machine (Roller-bed type) and so on.

1
    YRS
General Supplier
Supplier Homepage Industrial Equipment & Components Welding Equipment Arc Welder China Oil Gas Storage Tank Welding Machine for Tank Construction

China Oil Gas Storage Tank Welding Machine for Tank Construction

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $20000.00/ Piece
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Cooling Way: Air Cooling
Style: ISO 9001:2008, CE, CS
Frequency Range: High Frequency


Features:

1, Suitable for diameter of several meters to one hundred meters
2, Max. Efficiency of welding machines: 30 times of manual welding(AGW); 50 times of manual welding(EGW)
3, Applicable to both bottom-to-top and top-to-bottom tank erection
4, First X-ray qualification rate: Above 99%
Configuration:

1Plate cutting & Edge milling machine2Automatic girth welding machine(AUTO AGW)3Automatic electro-gas vertical welding machine(AUTO EGW)4Automatic butt/corner seam welding machine5Hydraulic lifting system6Automatic girth seam grinder7LNG tank welder


For storage tank / tower fabrication and on site construction, we begin to R & D of its automatic equipments and turn-key whole solution since year 2001. After years of development, NAEC developed different fabrication and construction machines for various seams of Oil Storage Tank / LNG Tank / Tower / Tank Farm. The automatic tank welding machines we developed meet CE standard. In the meantime,
NAEC also developed matched equipments for top-to-bottom construction method, which has been widely applied in both China Strategic Oil Storage Project and oversea tank construction project.
Now NAEC has matured equipment for both bottom-to-top and top-to-bottom tank construction. By NAEC solution, we can help our client to finish one tank construction within one month. The X-ray first qualification rate is no less than 99.5%. And the mechanical performance meets the requirements of low-temperature impact test.

Welcome to visit our company in Nanjing, China. For more information please contact us.