Raw Silk Yarn, Mulberry Raw Silk, Raw Silk manufacturer / supplier in China, offering Mulberry Raw Silk 100% Silk 20/22D Raw Silk Yarn, 80 Gauge Black Shrink Wrap Plastic Stretch Film, Black Heavy Duty Stretch Film for Stretch Wrap Plastic Film Roll and so on.
Min. Order / Reference FOB Price | |
---|---|
1 Ton | US $2200.00/ Ton |
Local Area: | Shijiazhuang, Hebei, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, PayPal |
Material: | POF |
---|---|
Usage: | Packaging Film |
Type: | Shrink Film |
Products Advantage:
Thickness is averae, shrink rate reach 65%, widely applied on irregular product packaing Coefficient of fraction stable, it's convenient for high-speed package processing proportion average betwwen the film layers, perfect sealing High temperature resistance, can keep toughness property under -20oC Big tensile strength, apply for manual, semi-automatic & high speed automaticpackaging machinery.Production Application:
Food, Beverage, household articles packagingDrug, health-care products outside or combinative packagingplastic & hardware packageStationery, toys & books packagingElectronic element & AV products packaging Etc.Shrink film Typical Properties:
Technical Data Sheet of POF Shrink Film from Shandong Lianzhong
Property
Unit
Test Method
Representative Value
Thickness
Micron
15
19
25
Density
g/cm³
0.922
0.922
0.922
Yield
/kg
72.5
57.2
43.5
Tensile propeiries
MD/TD
MD/TD
MD/TD
Elastic Modulus
N/mm²
ASTM-D882A
340/350
340/340
360/450
Tensile Strength
N/mm²
ASTM-D882
110/110
110/110
100/100
Elongation@ break
%
ASTM-D882
110/110
110/110
105/105
Seal Strength
g/cm³
Internal
870
1025
1250
N/mm²
57
53
49
Tear Propagation
g/cm³
5.5
9.5
14.5
COF.film to film.Kinetic
adim.
ASTM-D1894
0.26
0.25
0.24
Free Shrink@125-140
%
ASTM-D2732
MD/TD 65/65
MD/TD 62/62
MD/TD 60/60
Haze
%
ASTM-D1003
1.3
1.8
3
Gloss
photoc
ASTM-D2457
135
135
130
1.Material: POF
2.Characteristics: High tensile strength and transparent,water-proof and so on.
3.Color and size :Optional, it also can be according to the design as the requirement of customers.
4.Packing(standard packaging):Carton box, pallet, wrapping film or as clients request.
5.The delivery time:Normally it takes 15-20 days .
6.Payment terms: ByL/C, by T/T (30% deposit before production, 70% balance before loading).
7.MOQ:One tons (It also depends on the circumstance).