Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Press Fitting Machine, Clinching Machine, Riveting Machine
Establishment:
2006
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Clinching Machine, Clinching, Self Clinching Machine manufacturer / supplier in China, offering HVAC Ceu 15 Simitch Pneumatic Hydraulic Press Riveting Machine, High Pressure Big Throat Clinching Machine Price Cheap Clinching Machine, Clinching Machine for HVAC Air Duct Joint and so on.

1
    YRS
General Supplier

China Pipe Clinching Machine for HVAC Application

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $8000.00/ Set
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Automatic Grade: Semi-Automatic
Power Supply: Pneumatic
Warranty: 1 Year
Self clinching machine for HVAC application


Technical parameter
Impact pressure8.0 TonPower sourceHydropneumaticVoltage220V,50HzTotal travel100mmCompressed air source need3bar-8 barWeight600KGMax. thickness of clinching2mm+2mm

Our Workshop


Application

Test Equipment

Laser Marking Machine Tension Force Test MachineThree-coordinate Measuring System Deflection Instrument
CE Certificate
Warehouse

Characteristics:
1. Joint point are firm and credibility
2. Rivetless, low cost.
3. Match the pre-pressure device,overcoming distort badly.
4. Riveting time, pressure, speed are all can be adjusted.
5. National patent technology, number shows can accuracy to 0.1 second
6. Press gently , the molding tool loss is small
7. Can transform into round or square
8. The riveting area has no stress
9. Can not break the plating or painting in surface
10. To the metals material request not high, the copper ,aluminums, steel, zinc are all unlimited
11. Riveting process has no vibration, low noise, low consumption
12. Unnecessary to processing in before or after riveting joint, allow to have the mezzanine and multi-layer conjunction
13. Advanced counter and time shows window
14. The electricity control system's operating are convenience and safety
15. Can riveting different shapes after replaced the different die

Why choose Simitch:
-1. 14 years of manufacturing experience history.
-2. faster lead time, the fastest delivery is about 7-15 working days.
-3. CE & SGS certificate approval factory.
-4. Quality control for every step while production.
-5. Professional engineers have working experience in maximator.