Business Type:
Manufacturer/Factory
Business Range:
Filling Machinery, Beverage Machine, Juice/Water/Csd Bottling Line, Water Treatment ..
Establishment:
2000
R&D Capacity:
OwnBrand, OEM
OEM/ODM Service
Sample Available

CIP System, Clean in Place, Automatic CIP System manufacturer / supplier in China, offering CIP System for Filling Line, Vegetable Juice Beverage Liquid Packaging Machine, Pet Bottle Fruit Juice Filling Plant and so on.

1
    YRS
General Supplier

China Plastic Cup Water Filling Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $30000.00/ Piece
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Brand: Hy-Filling
Type: Volumetric Filling Machine
Automatic Grade: Automatic
Material Type: Liquid
Cup Wate Filling Machine
1) CE certificate
2) ISO9000: 2000 Certificate
3) Cup filling machine
Cup filling machine filling machine
Characters:
These series automatic cup forming, filling and sealing machine is applied of water, dairy products etc. It is linear stepped forming-filling -sealing type, suitable for 75-300ml cups capacity, mainly used in the milk, yoghourt, soybean milk, juice, jelly and water ect. The filling system adopts piston quantificational technology, high filling precision with fast filling speed. The sealing machine adopts rolled film as the sealing material, the machine working effectively and smoothly.
Technical Parameters:
Production capacity: Max. 15000 cups/hour
Available sheet thickness0.8mm
Filling volume: 75-300ML(standard type)
Filling error: 1
Drive motor power: 1.0-2.5kw
Total power: 25kw
Sealing type: Constant temperature hot press sealing
Compressed air wastage: 0.7Mpa-1.2 m3/Min
Power: 3N-50Hz 380V/220V
Weight: 2000kg
External dimension: 4300*900*1700 mm

PRICE TERMFOB ShanghaiSTANDARD PACKINGExport package suitable for long distance transport by sea & truckDELIVERY80 days since receipt of orderPAYMENT TERMS30% T/T as down-payment70% T/T before shipmentOFFER VALIDITY60 days from the date of the offerGUARANTEE12 months after installation & commissioning, or 15 month after delivery date