Business Type:
Manufacturer/Factory
Business Range:
Prefabricated House, Container House, Mobile House, Prefab Villa, Light Steel Structure
Establishment:
2010
R&D Capacity:
ODM, OEM
Terms of Payment:
LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Main Markets:
South America, Southeast Asia, Middle East, Others
OEM/ODM Service
Sample Available

Container House, Prefab House, Modular House manufacturer / supplier in China, offering Prefab Shipping Container Homes Modular Building Office Container Prefabricated House, China Modern European Style Villa Prefab Kit House Modular Home Villa, Made in China Easy Installation Light Steel Prefabricated Container House Hot Sale and so on.

1
    YRS
General Supplier
Supplier Homepage Construction & Decoration Prefabricated Building China Prefab Container Homes Manufactured Home Mobile House Villa

China Prefab Container Homes Manufactured Home Mobile House Villa

Get Latest Price
Min. Order / Reference FOB Price
100 Unit US $180.00/ Unit
Local Area: Taiwan, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Product Name: Family Living Villa Prefab Steel Structure House
Wall: 50mm/75mm Sandwich Panel
Door: Sandwich Panel Door/Security Steel Door
Hot sale factory direct price steel house prefabricated villa

Specification

Product Name

Prefab Villa

Color

Customized color is available

Wall

50mm/75mm/100mm EPS/Rock wool/PU sandwich panel with color steel sheet; 75mm/90mm FCB panel( Fiber cement board sandwich panel).

Roof

50mm/75mm/100mm EPS/rock wool/PU corrugated sandwich panel, color steel tile

Floor

waterproof and fireproof magnesium floor board

Ceiling

PVC ceiling board; Calcium silicate board; etc.

Flooring Deco.

ceramic tile; Solid wood composite floor; Vinyl sheet; etc.

Wall Deco.

Latex paint; PVC board; FCB board; metal engraving; wall paper; etc.

Window

UPVC or aluminum sliding window with fly screen, shutter window

Door

aluminum frame with panel same , compound wooden door, security door, rolled door

Ceiling plaster board ceiling, PVC ceiling, 50mm/75mm thick EPS/rock wool/PU sandwich panel

Steel structure

anti-rust, painted. Include rivet, screw

Joint material

steel column/aluminum alloy

Technical data

* Roof load: 0.3kn/m2

* Floor life load:1.5kn/m2

* Wind resistance: 0.3kn/m2, equal to against level 10 typhoon

* Earthquake resistance: magnitude- 7 earthquake

Note: If the criteria were exceeded, it can also load by reinforcing the structure.

Feature

* Prefabrication, easy to install and disassemble

* Lightness, easy to storage, transport and relocate

* Thermal and heat insulation

* Using several times and recycling, economy and environment friendly.

Flexible usage

Related Products

Project

about Us

Transportation&Packaging

FAQ

Q: Are you the factory or the trading company?
A: Certainly. We are the factory, and we can give you the best price.
Q: What's your MOQ?
A:Our MOQ is 20'GP. Any small trial order is also welcomed and can be in a further discussion.
Q: How many square meters can be loaded in 1 X 40'HQ container?
A: about 300 square meters.
Q: Can you provide samples?
A: Yes, we can. The sample will be cost 2 times of its original price but the extra cost will be return to you once you place the order.

Q: How many days needed to install the house?

.A team of 6 experienced workers can install 100sqm per day.

Q: How Is your after-sales service?
A: 1. Any question, welcome to contact us. 24 hours available for you

2. One order, one special person to follow the whole process

3. For the house installation, we will give you the installation drawing and installation manual. If you need, we also can send you an engineer to teach your workers, but you have to charge the double ticket, accommodation, food and salary.
Q: How many days needed to install the house?
A: For prefab camp house: 6 experienced workers 100sqm per day.

For 20ft flat pack container house: 4 workers 4 units per day.

For 20ft cost-effective container house: 4-6 workers 1 unit per day.

For single storey prefab villa(100m): 4-6 workers finished all installing in 1-2 week.

For light steel structure villa: 6-8 workers finished about 40sqm within 8-10 days

Contact Us