5HL-20
1.Develop the "three-stage method" of variable air temperature cereal drying technology. Research the relationship between precipitation rate of grain , the actual moisture and hot blast temperature, according to different stages with different hot blast temperature drying grain to improve the grain precipitation efficiency, saving energy consumption, to ensure the quality of grain.
2.Design differential speed grain discharge system and hot air equal-pressure and speed system in the drying section. Research the relationship between precipitation rate of grain,time of hot air drying, the tempering time and wind speed.Design adjustable grain discharge speed system as well as dry and wet air exchange system, keeping standing time of grain, hot wind speed and the tempering time all such parameters in their optimum during the dry period to improve the efficiency of drying grain and ensure the quality
3.Design a quick and emergent food discharge system. Make a mechanical grain discharge part in the food discharge section , when power failure or abnormal blackout cause electrical components stop running, by pulling the part, make the grain discharged by gravity avoid damage caused by burning, mildew of high moisture grain in storehouse
the main technical performance indicatorsModel No. 5HL-20Work principle Mixed-flowStruction Batch Type CirculationDemensionLengthmm2980Widthmm2380Heightmm11165Weightkg4100Volumem³44Outputkg/batch20000Work voltagekW12.3Breakage rate%≤0.5Waste rate%≤3ComsuptionkJ/kg(H2O)≤8120*1.4(5800)The moisture content after drying%≤1.0Drying capacityt·%/h≥15.0
Factory Pictures:
Pre-Sales Service:
1. Inquiry and consulting support
2. Sample testing support
3. View our Factory
After-Sales Service:
1.pay the double air tickets, accommodation and food. Our technicists can help you in local place
2.According to the requirement of the buyer, our company sends engineers for installation and commissioning in buyer's site including the training of skills of buyer's workers on operation, maintenance, etc.
3.Supply the solutions for different farming environment.
4. For the damage caused by the users, our company provides the parts and accessories with cost price.
5. Our factory supplies the wearing parts with the cost price to clients.
Products will be finished in 15-20 working days after payment. It depends on your order quantity. And the shipping time to the port is about 1-2 days