Business Type:
Manufacturer/Factory
Business Range:
Rubber Vulcanizing Press Machine, Open Mill, Rubber Refining Machine, Batch-Off Cooling ..
Establishment:
2010
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Rubber Mixer, Mixer, Mixing Mill manufacturer / supplier in China, offering Rubber Open Mixing Mill with BV ISO SGS, Waste Tyre Stripe Cutter for Cutting Scrap Tires, Waste Tyre Splitting Cutting Machine for Scrap Tyre Recycling Plant and so on.

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery Rubber Machinery Rubber Product Making Machinery China Rubber Molding Press Machine for Motorcycle or Bicycle Tyre

China Rubber Molding Press Machine for Motorcycle or Bicycle Tyre

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $12000.00/ Piece
Local Area: Qingdao, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Certification: CE, ISO, BV
Condition: New
Customized: Customized

Rubber molding press machine for motorcycle or bicycle tyre
Rubber moulding hydraulic press, four column rubber curing press is generally used for plasticity material and powder product forming; shaft and other similar parts correcting; electrical parts pressing; metal sheet blanking, stamping and drawing; aluminum buckle molding boards, integrated ceiling process and so on. This product is applied in the machine tool, automotive, motor vehicles, air-conditioned shell, mechanical bearings, powder metallurgy, and plastic industry.

Three beams and four columns structure Three beams are welded with tempering treatment Cartridge valve integrated hydraulic system: long service life, less hydraulic impact and reduce leak points Hydraulic system equipped with pre-release device to reduce hydraulic force impact Operation button centralized control and equipped with adjusting and semi-auto model Equipped with single-constant stroke and pressure functionOpiontal function and devices: light curtain, displacement sensor, pressure control and managementsystem, heating or cooling device, blanking buffer device, floating guide-way and rolling bracket for die changing.

Please check technical specification of rubber moulding hydraulic press, four column rubber curing press.

Type

Unit

40T

63T

100T

160T

200T

250T

315T

Nominal Force

KN

400

630

1000

1600

2000

2500

3150

Max. working Pressure

Mpa

22.6

24.7

26.3

25

25

25

25

Max. opening Height

mm

600

700

800

900

1000

1150

1200

Slider Stroke

mm

400

500

550

600

700

750

800

Ejector Force

KN

63

100

200

250

400

400

630

Ejector Stroke

mm

100

120

160

160

200

200

250

Slider Speed

Idle

mm/s

50

80

>100

>120

>120

>150

>150

Working

mm/s

10

10

8

8

10

10

10

Return

mm/s

65

70

85

100

100

100

100

Worktable Size

L-R

mm

400

580

710

800

900

1120

1260

F-B

mm

400

500

580

600

900

900

1000

Blanking Hole Diameter

mm

Φ100

Φ100

Φ120

Φ120

Φ120

Φ120

Φ120

Motor Power

KW

5.5

5.5

7.5

11

18.5

18.5

22

Overall Size

L-R

mm

1400

1600

1800

2460

2800

3200

3400

F-B

mm

1000

1000

1200

1200

1200

1400

1400

Height

mm

2300

2650

2900

3200

3700

3900

4150

Gross Weight

KG

2000

2800

4200

5500

6500

7800

12000


FAQ-Problems of customer concern:
about machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3. Q: Which PLC?
A: Siemens, Omron, Mitsubishi
4. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
about installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
about after-sales service
1. Q: What is the warranty time?
A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.
Ms. Lareina Fan
Tel:+86-532-86133233
Fax:+86-532-86133233

Cell:+86-133-9639-0206