Diesel Excavator, Excavators, Digger manufacturer / supplier in China, offering Sany Sy215c 22 Ton Crawler RC Hydraulic Excavator for Sale, Sany Sy35 Brand New Hydraulic Mini Crawler Excavator, Sany Sy235lr 25t Tracked Excavator Equipment Best Excavator Brand Manufacturer and so on.
Min. Order / Reference FOB Price | |
---|---|
1 Piece | Contact Supplier |
Local Area: | Changsha, Hunan, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment |
Type: | Road Roller |
---|---|
Working Method: | Wheeled |
Axle: | Uniaxial Monowheel |
Sany SPR260C-6 pneumatic tyre roller's hydraulic all-wheel braking is engaged upon engine or transmission failure. The braking distance of the 200hp pneumatic tyre roller is 50% less than similar equipment.
Automatic Oil-spraying Technology
Pneumatic powered automatic oil-spraying prevents asphalt from sticking to the tires
Two minute suction refill of oil tank eliminates the manual refilling
Eliminates the safety hazard of manually applying oil
Full Hydraulic Drive System
Continuously variable drive system provides smooth starting and stopping
Controls are easy to learn and easy to operate
Automatic Inflation System
Tire pressure is adjustable from within the cab
Even and consistent air pressure ensures compaction quality
Air pressure is maintained even when a tire has a slow leak
Exceptional Compaction Performance
Meeting the demands of compaction for asphalt road and cement stabilized base
Operating weight26000kgSingle tire load2.89 tTire overlapping63 mmEmissionsstage iiiRated power132 kWWater tank500 L
Producing Environment
Company Information
SANY On Exhibition
Contact Us
FAQ
1: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted
2: What certificates are available in Machinery?
A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC,
3: What about the delivery time?
A: 7-20 days after receiving the deposit.
4: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occuts first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 pcs