Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Packaging Machine, Powder Packaging Machine, Milk Powder Packing Machine manufacturer / supplier in China, offering 2000L Powder or Granule Products Auto Weighing Filling Packing Machine, Automatic Cellophane Overwrap Packing Machine, Paper Bag Microwave Popcorn Packing Machine and so on.

1
    YRS
General Supplier
Supplier Homepage Packaging & Printing Packing Machinery Strapping Machine China Semi Automated Paperboard Bundling Machine

China Semi Automated Paperboard Bundling Machine

Get Latest Price
Min. Order / Reference FOB Price
1 set US $2000.00/ set
Local Area: Taizhou, Zhejiang, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Application: Carton, Corrugated Paper, Paperbox
Strapping Material: Plastic Tape
Automatic Grade: Semi-Automatic

Semi-automated PE Bundling Machine

Product namePE Bundling machineDelivery time30 days after received your paymentDelivery portShanghaiDelivery time30 days after receive your depositPayment30%TT as deposit

Technological parameter


modelMax.tying size (mm)Min tying size (mm)Table depth(m)Tying speed (s/knot)Twine usedMotor Power(w)Power Suppy(v)Machine size (mm)Weight (kg)MHQ-1201200*800400*2003201.2PE28#5502201750*1200*1700228MHQ-1001000*500200*1603201.2PE28#5502201550*1160*1620218MHQ-70700*400150*1203201.2PE28#5502201060*1080*1550160

Details:
Usage and characteristic:
PE automatic bundling machine mainly used in the field of carton,corrugated paper,paperbox,color box and color printing industry,replace the procedure of bundling by hand,reduce labor cost largely,this machine only need one person to operate.
suitable usage:steaping the carton,corrugated paper,paperboard,paperboard the big size material ect,as well as news paper,book,and clothes.
Quick speed,save the labor,save time and easy to operate
High efficiency:Economical,reduce the packing cost to create the profit
Adopt electronic(or mechanic)control,the function is steady,power is small,only need 3kilo-watt for 1 day work.
DELIVERY DATE:
Within 10 days upon the receipt of the down payment


Http://www.sinofude.com

5/6














SHANGHAI FUDE MACHINERY MANUFACTURING CO.,LTD
No.33, Industrial Zone, Jiaohang, Fengxian Dist, Shanghai 201400
Tel: 86-21-57416165-801~807
Fax: 86-21-57416165-808



TERMS OF PAYMENT:
40% by T/T as the down payment, the balance shall be paid by T/T
before shipment.

INSTALLATION AND TRIAL RUN:
The equipment layout design, assembling and installation, start-up
and local team training will be FREE at no cost.

WARRANTY:
The seller guarantees the quality of the products for 12 months since
the date of installation. During the warranty period, any
problems/defaults happen on the hard parts of the machinery, the
buyer will replace the parts at the seller's cost. If the defaults are
aroused by the defaulted operations, or the buyer needs the technical
assistance for the processing problems, the buyer should be
responsible for all the cost and their allowance.