Application
Model ST02 sealant spreading machine is made with the latest domestic and international technologies, which applies to the sealing and spreading of secondary sealant. A /B pump adopt S. Korea pneumatic air motor, which works sensibly and reliably. Its unique adjustable proportioning mechanism meets the rigorous requirements for double constituent sealant proportion to maximum extent, with a smooth sealant flow, good coating effect and high production efficiency as well.
FeatureSuitable for mass production of insulating glass and curtain wallPneumatic control, easy for operationA/B air motor adopt American advanced technology, S. Korea brand air motorIntegrated structure of A/B sealant pump, avoid sealant leakageSpecial device to avoid A/B sealant pump running idle.Special one-way value in high pressure pump, sealant output smoothly, suitable for all kinds of sealant, avoid incomplete mixing.Multi filter system to keep clean of sealantStainless steel mixer and unique sealing gun, guarantee the sealant mixing effectOne-way valve is made of high wear-resistant material, long life timeThe rotating arm is equipped with universal device, flexible and portableParameter
Mixing ratio6:1-14:1Sealant output4-10L/minMax. dispensing pressure30MpaAir supply0.8-1.0 MpaAir consumption0.8M3/minDiameter of A/B drum570mm/280mmDimension1750x950x1980mmWeight510Kg
Brand parts list
NameBrandCountryA/B air motorHasco/YLS. KoreaSafety valveHascoS.KoreaPressure gauageDeltaTAIWANSealing gunSelf-madeChina
Mostly asked questions below:
1. What is your soonest lead time?
A: 60 days for whole production line, 30 days for single machine. Special requirement pls check with sales.
2. How do you arrange the shipment?
A: all machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.
3. Guarantee ?
A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.
4. How we can install the machines?
A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.
5. How about the after service?
A: Spare parts within 72 hours.
Experienced technical sales sort out most of your questions.
Tens of service engineers ready for on-site service and instruction.