Business Type:
Trading Company
Business Range:
Filling Machine, Beverage Machine
Establishment:
2010
R&D Capacity:
ODM, OEM, Other
Terms of Payment:
LC, T/T
Main Markets:
South America, Africa, Domestic
OEM/ODM Service
Sample Available

Mineral Machinery, Packing Machine, Water Bottling Machine manufacturer / supplier in China, offering Full Automatic Mineral Liquid Water Pet Bottle Washing Filling Capping Bottling Machine, Automaic Rcgf16126 Bottled Juice Filling Machine, Beer Pop Cans Filling Machine and so on.

1
    YRS
General Supplier

China Sleeve Shrink Labeling Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $10000.00/ Piece
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Automatic Grade: Automatic
Applicable Industry: Beverage
Application: Cosmetics, Drinks, Skin Care Products, Hair Care Products, Oil, Tea, Dairy Products

Sleeve and Shrink Labeling Machine (SLM)


1. This machine adopts international advanced technology, cover the circle label on the pet bottle, and then hot shrinking to fix on special the position which bottle body is designed.
2. This machine is compact, and suitable for the production line of different direction and different height.
3. The machinery part adopts combination designing of modularization, and makes the machine reasonable.
4. The height adjustment adopts motor fluctuating; It is convenient to replace the material.
5. The special cutter head design, makes the film-rolling cut more exactly and reliably.

Label inserted headSLM-100SLM-150SLM-250SLM-350Capacity(b/min)100 150 250 350 Diameter(mm)50~9050~9050~9050~90Material of labelPVC PET OPP OPS PVC PET OPP OPS PVC PET OPP OPS PVC PET OPP OPS Thickness of label(mm)0.035~ 0.10.035~ 0.10.035~ 0.10.035~ 0.1Overall dimension(mm)2400*950*2100 2400*1000*2000 2440*1000*2200 2440*1000*2200 Weight(kg)450550600700


No.NameBrand1SwitchSchneider (waterproof)2Current protectorSchneider (waterproof)3Electromagnetic contactoSchneider (waterproof)4RelayOmron5ButtonSchneider (lighting)6Photoelectric sensorGerman sick8Inverter 9PLC 10MotorKINCO11BearingNSK12InterfaceEASYVIEW13Machine' s bodySUS304 stainless steel


Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.

While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.

When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.

2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.
Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.

2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight