Business Type:
Trading Company
Business Range:
Special Steel
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
Terms of Payment:
LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Main Markets:
Southeast Asia, Middle East
OEM/ODM Service
Sample Available

Round bar, steel round bar, alloy steel round bar manufacturer / supplier in China, offering 1.7225/SAE4140 Q+T round bar for mechanical, H13/1.2344 ESR machined round bar for die and tool, SUS304/ S30400/304/ 304C1 Stainless Steel sheet and so on.

1
    YRS
General Supplier

China Special Steel Round Bar Steel Bar

Get Latest Price
Min. Order / Reference FOB Price
3 Tons US $1630.00/ Tons
Local Area: Guangzhou, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Standard: DIN, JIS, AISI, ASTM, GB, BS
Technics: Hot Rolled
Application: Tool Steel Bar
1.6523, SAE8620, 20CrNiMo Forged Steel Round Bar for MechanicalChemical CompositionCSiMnCrNiMoSP0.18-0.230.15-0.35Wheel & Caster 0.70-0.900.40-0.600.40-0.700.15-0.25≤0.035≤0.035
1.Feature:
1) Demand has high yield strength, tensile strength and fatigue strength, there has enough plasticity
and toughness;
2) Demanding by refining outside the furnace, vacuum electroslag remelting oFeeder r processing, or double vacuum smelting, vacuum induction furnace smelting suitable heat treatment;
3) Corrosion resistant steel, heat-resistant steel, wear-resistant steel, magnetic steel, and other
special physical and chemical propertOther Instruments & Meters ies of the steel;2.Application:
1) Zinc, aluminum, magnesium and otheralloy die-casting molds;
2) Heat dies and all kinds of hot forged molds;
3) metal extrusion die holder;3. Ready Stock:
Round bar dia20-100mm black surface and hot rolled deliver condition.4.Heat Treatment
1) Preheating 2-4 hours in500-600°C;
2) Keeping temperature for 2hours in850-880°C;
3) Oil cooling to reach 50-100°C;
4) After quenching can reach ahardness of 50-52HRC, then tempered at200°C,
then hardness can reach above 48 HRC;5Capacitor .Melting Process
1) EAF:Electric Furnace+LF+VD (Optional);
2) ESR:Electric FurnaceSocket & Outlet +LF+VD+Eleroslag Remelted (Optional);
6.PackagingDetails:
Packed with plastic film, seaworthing packing, others according to customers' requirements;7.Delivery time:
Forabundant stock, 15-20 days.For customized products, 30-50 days.All the sizes as require can be customerized as fresh production with MOQ,products
of required specifications can be developed/produced per international, chinese or
industry standards, or based on agreements with customers.Steel plate