Business Type:
Manufacturer/Factory
Business Range:
Steel Structure Workshop, Other Parts of Steel Structure, Welded Pipe, Galvanized T Beam, ..
Establishment:
2012
R&D Capacity:
OEM
Terms of Payment:
LC, T/T, D/P
Main Markets:
Southeast Asia, Middle East, Australia
OEM/ODM Service
Sample Available

Galvanized T Beam, Welded T Beam, T Profile manufacturer / supplier in China, offering Hot Dipped Galvanized Steel T Beam / T Lintel / T Section, Z500G/M2, ASTM A572gr50 A992 Submerged Arc Welding Steel Structure Building Manufactured by Structural Steel Fabricator for Contractor, Sheet Steel Fabrication Australian Standard Hot Dipped Galvanized Welded T Lintel T Beam T Bar Manufactured by China Steel Fabricator and so on.

1
    YRS
General Supplier

China Stainless Seel Checkered Plate

Get Latest Price
Min. Order / Reference FOB Price
20 Ton US $500.00/ Ton
Local Area: Qingdao, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P
Type: Steel Plate
Standard: ASTM, AISI, GB, JIS, DIN, BS, GB, ASTM, JIS etc.
Certification: ISO, RoHS, IBR

1. Item: Stainless steel checkered plate, stainless steel plate, steel sheet
2. Pattern: Diamond, Hyacinth Bean, Chrysanthemum or be required
3. Thickness: 0.3mm-10mm'
4. Length: 2000mm, 2438mm, 2500mm, 6000mm, 6096mm, or as your requirement
5. Width: 1000mm, 1219mm, 1250mm, 1500mm, 2000mm, or as your requirement
6. Payment Term: T/T, L/C,
7. Package: Standard export package or be required

Commodity Stainless Steel Checkered PlateBrandjiahexin steelStandardASTM, AISI, EN, JISAdvantagesExcellent and high quality control; Competitive Price; Ample stockage, prompt delivery; Firm in structure; Durable in use; Strong corrosionApplications Machine-made industry, Chemical industry, Shipping industry, Architecture, Food industry, Household products, Bridges, Transmission tower, etc.CertificationISO/SGSExport Markets North America, South America, Eastern Europe, Southeast Asia, Oceania, Mid East, Eastern Asia, Western Europe Price TermsFOB, CIF, CFRPayment TT, L/CDelivery Timeabout 10 days after the confirmation of the depositPackageExport standard package or be required