Evaporator, Condenser, Surface Cooler manufacturer / supplier in China, offering Customized Fin Type Freon Evaporator Coil for Heat Pump, Counterflow Fin Tube Water to Air Heat Exchanger Srz Type, Stainless Steelheat Transfer Oil Air Heat Exchanger and so on.
Min. Order / Reference FOB Price | |
---|---|
1 Piece | US $2400.00/ Piece |
Local Area: | Guangzhou, Guangdong, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, PayPal |
Certification: | CE, ISO, RoHS, UL |
---|---|
Application: | Heater, Cooler |
Principle: | Recuperative Heat Exchanger |
Max plate no.60pcsMax flow rate4m3/hSingle plate thickness0.3~0.7mmUnit plate area0.023m2Brazed material99.9% copperVolume per channel0.030L/channelRaw material304 stainless steel or 316 stainless steelDesign pressure1.0Mpa or 3.0MpaTesting pressure2.0Mpa or 4.5MpaDesign temperature-195ºC --200ºC
FAQQ1:Why choose QINGLI
We wish to be your First-choice one-stop heat exchanger &refrigeration Parts supplier.We are a manufactures for more than ten years!All of our products can accept customization,Our mission is to provide integrated heat exchanger &refrigeration Parts for professional, efficient service.Q2:How is quality ensured?
All our processes strictly adhere to ISO-9001 procedures.Before leaving the factory after strict pressure and tightness testing.If the product does not work properly as described, and proven to be at our fault, we will provide exchange services only for the same specific item.Q3:If we don't find what we need on your website, what should we do? Do you make customer's heat exchanger &refrigeration parts?
You can send the pictures and drawings of the products you need by email, we will check if we have them.otherwise, We can customize new products according to customer's needs.Q4: What is the main market for your products?
Our main market is in Middle East, South America, Europe and USA.Q5:What about delivery time?
If we have stock of the item you need,we can send goods to you within 3 working days after deposit or 100% payment into our bank account.
If we don't have stock,different products' production time is different.Generally, it needs 7 to 20 working days.