Business Type:
Manufacturer/Factory
Business Range:
Stainless Steel Handrail, Pipe Fitting, Handrail Fittings, Stainless Steel Balustrade, ..
Establishment:
2012
R&D Capacity:
OwnBrand, ODM, OEM
Terms of Payment:
LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Main Markets:
North America, Europe, Africa
OEM/ODM Service
Sample Available

Kitchen Mixer, Mixer Tap, Pull Down Faucet manufacturer / supplier in China, offering Ablinox Stainless Steel Single Handle Upc Pull out Kitchen Faucet, Square Handle Stainless Steel Casting Kitchen Faucet (AB108), Durable Quality Stainless Steel Upc Kitchen Faucet (AB016) and so on.

1
    YRS
General Supplier
Supplier Homepage Construction & Decoration Stairs & Stair Parts Stair Parts China Stainless Steel Handrail System Support Cc101

China Stainless Steel Handrail System Support Cc101

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $5.00/ Piece
Local Area: Zhaoqing, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Function: Handrail System Base
Style: Glass or Rod/Cable
Stair Railing / Handrail: Stainless Steel
------->>> Product Description

Product NameABL Stainless steel Handrail Bracket/Handrail Support Material SS304/316 FinishSatin/Mirror polish Thickness1mm,1.2mm,1.5mm,2mm/Customized SizeFor tube size 38.1mm,42.4mm 50.8mm/40*40,50*50 CertificateISO 9001-2000, Product Quality Certificate Usage Handrail, staircase, balustrade and pipe PackingBubble Wrap inside,Steel Pallet outside OEM/ODMAvailable MOQ1Piece Delivery Time15 to 30 days upon down payment


------->>> Our advantages

1.We can support sample for you..
2.OEM/ODM products are available.
3.Quick and nice after-sale service.
4.Fast and safe delivery.
5.Solid casting and full welding process.
6. Easy install and secure material.
7. Special application upon you request.

------->>> about Us

Company nameGREEN ABL INTERNATIonAL LIMITED
FOSHAN ABLINOX SANITARYWARE CO.,LTDCompany scopeSanitary wareFactory locationZhaoqingAddressLong Wang Miao Street,Ying Bin Road,National high-tech district,ZhaoQing,Guangdong,China.Established timeEstablished in 2008ABLinox Culture1.Everyone love ABLinox product
2.To be a famous international brand
3.Do brand in one hundred


Factory plant area: Actual area 15,000 square meters

Production workshop: including ordinary stamping, precision high-speed stamping, laser cutting, laser welding, drilling, tapping, CNC processing, butt welding, argon arc welding, CNC turning, surface grinder processing, cylindrical grinder processing, mirror polish processing, etc.

Product Design: Green ABL system is designed by Spain professionals. We produce professional stainless steel railing system, glass clamps, pipes, bars, stainless steel faucets, stainless steel bathroom accessories, handles and the casting floor drains.

Our Aim: Green ABL series aim to save labor costs during their final installation, and focus in its perfect integration with the handmade metalwork. They are easy to put together, and can be assembled in many different ways, which saves you a great deal of time and money.
------->>>
We have various types of building material/sanitaryware.
If you want to know more about our products, welcome to contact us and get the catalog.
We are willing to provide with sample for quality and function testing.
Welcome to visit our Factory.
FAQ:
1. How to get a quotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.

2. What if we do not have casting drawing?
Samples would be available, and we would send you drawing to /confirm/i.
Of course, we would ensure the safety of the drawing.

3. How to pay?
T/T is preferred.

4. How to ship?
For small quantity, we have cooperation with DHL,TNT, FEDEX, UPS etc
For big quantity, air or sea would be available for you to choose.
5. What about the packing details?
We have our regular packing.
If you have any special requirements, we would be willing to help.

6. What about the delivery time?
It would be 20-30 days normally for the parts to be ready and we had a system to ensure the time.
When you made your order, you would know.