Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Sheet Metal, New Energy Heating System, Sheet Metal Fabrication Parts
Establishment:
2017
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Sheet Metal Fabrication, Sheetmetal Parts, Customized Metal Parts manufacturer / supplier in China, offering OEM ODM Precision Sheet Metal Parts, BBQ Stove Picnic Stainless Steel BBQ Grill, Speedstiles Channel Gate Access Control and so on.

1
    YRS
General Supplier

China Stainless Steel Titanium Tool Box Drawer

Get Latest Price
Min. Order / Reference FOB Price
10 Piece US $0.10/ Piece
Local Area: Hangzhou, Zhejiang, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Transport Package: Carton Box Wooden Frame
Specification: customized
Trademark: Dorcas
As a professional sheet metal fabricator ,we supply a variety of stainless steel and titanium steel flower vase ,stainless steel decoration frame,folding screen,mirror frame stainless steel products,sheet metal parts,stamping parts ,CNC laser cutting parts ,bending parts and related sheet metal products per customer design.
Process
CNC punching ,CNC bending ,CNC forming, Laser cutting,TIG/MIG welding,finishing,Assembly
Sheet metal Struture products
Materials used:
* Steel, Stainless Steel, Galvanized steel, Aluminum, Copper
* Material thickness ranges from 0.2mm-30mm depending on material
* RoHS compliance for some materials
* Material Certifications available upon request
Finishing:
* Powder coating, painting, plating, anodizing, polishing, Sandblasting, etc.
Typical Applications:
* Telecommunications
* Computer Storage
* Medical
* Industrial Equipment / Machines
* Retail
* Military
* Hospitality
* Advertising / Promotion
Custom sheet metal designs are welcome!
Material :Carbon steel
Material Thickness :1.0 MM
Surface Treatment :Powder Coated

Measurement :MM
Packaging & Shipping
1 Wooden well protection package
2.Fast way: By express,such as: DHL, Fedex, UPS, TNT, EMS...take about 3~7days.
3.Cheap way(small package):By China post,should take about 15~70days.
4.Cheap way:By Sea shipment.