This 2160m2 carpet factory is one of the many steel framed construction factory building that Double Grand have designed and built.
Wind: 10m/s
No snow
Size: 54*40*7m
Steel structure: Hot rolled H beam C purlin, bracing etc
Brick wall: 500mm height
Wall: Green color galvanized steel sheet, 0.5mm thickness
Roof: Green color galvanized steel sheet, 0.5mm thickness
1. Light weight, high strength, 50years durable use, no construction waste.
2. Quality certification ISO:9001:2008
3. Cost considering: time saved, cost saved;
4. Easy move, materials can be recycled used, environmentally;
5. Used widely, used as factory, warehouse, office building, aircraft hangar etc;
6. Structural durabilities, easy maintenance.
Technical Parameters:
1. Main Steel Structure:use build-up steel column,welded H-beam steel
2. Purlin:c-type steel
3. Roop panel: single steel sheet or sandwich panel
4. Wall panel:the same to roof panel
5. Tie bar:welded-round tube
6. Brace: round steel
7. Column brace and lateral brace:angle steel
8. Crane:3T-30T
9. Angle brace:hot-rolled angle steel
10. Edge:color plate
11. Gutter:stainless steel
12. Down pipe:PVC Pipe
13. Door:sandwich-panel door or Rolling door
14. Window:aluminum alloy window or PVC window
Detailed description of steel structure construction factory buildingDimensionLengthcustomer designedWidthcustomer designedHeightcustomer designedWeather conditionWind speedm/s or km/hSnow loadkg/m2EarthquakedegreeLife span 25-50 yearsSteel frameMain frameQ345B &Q235Secondary frameQ235 C or Z section Purlin,Round BarBracing Angle brace,Welded PipeMaintenance frameWall &Roof claddingSingle color corrugated steel sheetEPS,Glass wool,Rockwool,PU,etc sandwich panelSteel sheet THK.: 0.3-0.7mmHeat Insulation THK.: 50-150mmSurfacePanited surfaceAntirust paint, total thickness:100-120um;Warranty period:18-20 yearsHot dip galvanized surface65, 86um;Warranty period:45-50 yearsAccessoriesDoorSliding door; Rolling up door; Folding tip-up door; PVC doorWindowPVC window; Aluminum alloy window Drainage systemDelivery time20-25daysShipmentsteel frame is packed in 40' OT container,Maintenance frame and others are packed in 40' GP or 40' HQ