Business Type:
Manufacturer/Factory,Trading Company
Business Range:
flat face mask machine, folding face mask machine, bouffant cap machine, shoe cover machine, glove making machine
Establishment:
2009
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
Domestic Market, Southeast Asia, Africa
OEM/ODM Service
Sample Available

Dongguan Licheng Machinery and Equipment Co., Ltd. is a new enterprise which integrates RD, manufacturing and sales, specializing in the production of non-woven deep processing equipment. Our company ...

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery Textile Machinery & Parts Nonwoven Machine China Superior Performance Flat Inner Earloop Face Mask Machine

China Superior Performance Flat Inner Earloop Face Mask Machine

Get Latest Price
Min. Order / Reference FOB Price
10 Piece Contact Supplier
Local Area: Dongguan, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Application: Face Mask
Automatic Grade: Automatic
Certification: CE, ISO9001: 2000




Process flow
Material on the shelf--fabric discount--nose cutting line--forming welding--forming cutting--conveying face mask--earloop strap welding--braid welding--finished product conveyor line

Precautions for equipment installation
1. Remove the package, check whether the surface and parts of the machine are damaged, whether the screws are loose, and whether the electrical connectors are Lock tightly, whether the accessories are complete;
2. The machine should be placed on a flat hard ground, the face mask machine should be at least 0.5M away from the heat source, and make sure it is in front of the face mask earloop machine There is a distance of at least 1M at the back, and a space of at least one meter on the left and right, which is convenient for operation;
3. Check the voltage requirement of the mark on the reverse side of the vibration box to ensure that the system is well grounded;
4. Connect the machine to the power supply, first turn off the power switch.
Equipment acceptance
1. After installation and commissioning are completed by the supplier, the buyer will be notified 3 days before shipment, and the buyer will provide qualified materials and arrange technicians to come to the supplier On site, the acceptance shall be carried out according to the technical agreement, the acceptance shall be qualified, the two parties shall sign the qualification report, and the supplier shall deliver the goods;
2. The materials used for the acceptance test machine shall meet the requirements of this agreement, and the specific parties shall agree separately in the attachment;
3. The acceptance inspection shall be participated by the designated engineering and technical personnel of both parties and signed the acceptance report together:
(1) Acceptance according to configuration details;
(2) The main body of the machine does not contain power and air sources other than the machine, and the buyer needs to pull the power and air sources into the electrical box.