Business Type:
Trading Company
Business Range:
Tower Crane, Mast Section, Fixing Angle, Motor, Reducer
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
Terms of Payment:
LC, T/T, WesternUnion
Main Markets:
Europe, Southeast Asia, Middle East
OEM/ODM Service
Sample Available

Load Limit Switch, Hoist Limit Switch, Trolley Limit Switch manufacturer / supplier in China, offering Tower Crane Dxz Slewing Limit Switch for Safe Load Indicator, Hoist Tower Crane Passenger Hoist Cable 3X16+10X6 Gjj Cable, Tower Crane Electrical Power Cable for Construction Passenger Hoist and so on.

1
    YRS
General Supplier

China Telescopic Platform System with High Quality

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $50.00/ Piece
Local Area: Shenyang, Liaoning, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, WesternUnion
Size: 3m
Model: 3m Ladder for Mast Section
Painting: Galvanizing
3m ladder for tower crane
3m ladder for tower crane mast section
Our Services
Good Quality: Gotten certification of ISO9000:2000 & CE & SGS & EAC.
Best price: Best offer with suitable payment terms.
Good Saled Service: Tow technicists provided to assistant installment,ect.( Buyer beared the fee).
Delivery on Time: Report order progress. Make sure Delivery on time.
Warranty: Provide a warranty of 12 months(Steel wire rope not included)from the bill date(arrival of destination).
We could supply tower cranes and many kinds of tower crane parts to meet customers' demands.
If you have any inquiry for tower crane or tower crane parts, please contact us. It is our great honor to cooperate with you.

Basic work stepsHidden troubleThe control method1. The tower shall be attached to the platform for the transportation and placement of materials used for the use of scaffold.1. The transporter stands on the standard festival platform, 22 meters high
Drag the tower hanging from the handle, fall high
1. The transporter stands on the platform of tower crane standard. 2. The seat belt is securely fastened. 2. Pull the tower crane from the handle of the hamstring, and the tower crane is too fast,
Steel pipes scattered, objects struck.
1. First, pull the handle from the hamstring to the standard section, and then the tower will fall slowly. 2. The handle of the foot falls completely on the standard section. 3. Lower warning in the lower part of the tower, guardians control personnel in and out. 3. The foot tube is placed on the standard section, falling and the object hits1. Use the palm rope to tie the ends of the foot to both ends and standard sections. 2. Below the tower, the warning is isolated and the guardians control personnel in and out. 4. Use the brown rope to pull the fastener, the fastener is scattered, the object hits.1. When the brown rope is pulled, it shall not be rubbed against the corner of the tower crane. 2. Use packing bags for the fasteners, not too much. 3. Lower warning in the lower part of the tower, guardians control personnel in and out. 5. Improper placement of the fastener, falling, and object hitting1. The fastener is placed in the bag, placed on the standard section platform, and fixed with wire, not scattered. 2. Below the tower, the warning is isolated and the guardians control personnel in and out.2. The tower shall be attached with scaffold platform1. The scaffolds fall on high places.1. The scaffold will be set up on the platform of tower crane standard. 2. The seat belt is securely fastened. 2. The material falls when the scaffold is set and the object hits.1. When one person takes the footpipe and the fastener, the other person will fix the material and start the homework. 2. Set up the foot handle, and when rotating the body within the standard section, pay attention to the structure of the tail collision standard section of the foot, causing the falling object and the operator to work together. 3. Lower warning in the lower part of the tower, guardians control personnel in and out. 3. When the scaffolding is set, the tool drops and the object hits.1. Use the strap to secure the wrist and prevent it from getting out of hand. 2. Below the tower, the warning is isolated and the guardians control personnel in and out.